The project consists in the construction and operation of a gas fired power plant of 1,524 MW net power capacity and a seawater desalination plant of 50 million gallons per day net capacity. The project is located in the vicinity of Al Dur.

More detailed information on the project’s environmental, social and human rights aspects can be found in the Summary of the Environmental and Social Impact Assessment (ESIA, PDF, 1,5 MB).

The project involves the construction of the hydro power plant Zenso at the Kwanza River in Angola. Once completed, it will have an installed electrical capacity of 950 MW.

More detailed information on the project’s environmental and social impacts as well as human rights aspects can be found in the Environmental Impact Study (Summary Report, PDF, 9,93 MB).

The project involves the construction of the hydro power plant Caculo Cabaca at the Kwanza River in Angola. Once completed, it will have an installed electrical capacity of 2,120 MW.

More detailed information on the project’s environmental and social impacts as well as human rights aspects can be found in the Summary Report of the Environmental Impact Study (Summary Report, PDF, 10,9 MB).

The consists in the construction and operation of a wind farm with 114 wind turbines and a total capacity of 474 MW about 35 km north of the town of Sundsvall. The two wind farms Björnlandhöjden (BJL – 167 MW) and Hästkullen (HAS – 307 MW), which together represent the project as a whole, are about 7 km apart from each other. In order to connect them to the grid a total of 65 km aerial power lines will be built. More detailed information on the project’s environmental, social and human rights aspects can be found in the summary of the Environmental Impact Assessment (EIA, PDF, 363 KB).

If required, additional information can be requested by email at info@exportkreditgarantien.de.

The project consists in the construction of paper mill with an annual output of 2.2 mio. tons of paper and paperboard. For energy and steam purposes a combined heat and power plant will be built to supply the project. The location is part of a large industrial development approximately 49 km south of the city of Jinzhou.

More detailed information on the project’s environmental, social and human rights aspects can be found in the Summary of the Environmental Impact Statement (EIS, PDF 764 MB).

The project consists in the construction and operation of an electric-scooter and car manufacturing plant on the “Cat Hai Island” near Hai Phong City. The planned production capacity is up to 250,000 cars and 100,000 electric-scooter per year.

More detailed information on the project’s environmental, social and human rights aspects can be found in the Summary of the Environmental Impact Assessment (EIA, PDF 674 KB).

The project consists in the construction and operation of two parallel, roughly 1,230 km long pipelines from Russia across the Baltic Sea to Germany.

More detailed information on the approval procedures and the environmental impact assessments can be found here. In-depth information on the project’s impacts on the area of the landfall in Russia can be found here.

The project consists in the construction and operation of a 35 MW wind farm 6 km north of the town of Gemlik.

More detailed information on the project’s environmental, social and human rights aspects can be found in the Summary of the Ecosystem Study Report.

The project consists in the construction and operation of a petrochemical plant at Ain Suchna on the west coast of the Gulf of Suez.

More detailed information on the project’s environmental, social and human rights aspects can be found in the Environmental and Social Impact Assessments.

The project involves the construction of a gas-fired power plant and a LNG Terminal in Brazil. The facilites are constructed as part of a new port development. More detailed information on the project’s environmental and social impacts as well as human rights aspects can be found in the executive summaries of the Environmental Impact Assessments [Summary 1 (PDF, 5.23 MB), Summary 2 (PDF, 4.95 MB), Summary 3 (PDF, 8.45 MB)] . 

The project consists in the construction and operation of the air cargo terminal of the new Istanbul airport 35 km northwest of the city centre of Istanbul.

More detailed information on environmental, social and human rights aspects can be found in the Environmental and Social Impact Assessment.

The project involves the construction of a hydro power plant at the River Neuquen in Patagonia, Argentina. Beside electricity generation the dam will be used for irrigation and flood control purposes. 

More detailed information on the project’s environmental and social impacts as well as human rights aspects can be found in the executive summary of the updated Environmental Impact Assessment (EBISA – Executive Summary, PDF 1.27 MB). 

The project involves the construction of a gas pipeline through Greece, Albania and Italy (Trans Adriatic Pipeline – TAP). The project is part of the Southern Gas Corridor pipeline which will transport gas from Azerbaijan to Europe. 

More detailed information on the project’s environmental and social impacts as well as human rights aspects can be found in the Environmental and Social Impact Assessments for each of the countries affected.

Reporting to the OECD

The publication of Category A and B projects for which cover has been granted is part of the rules laid down by the OECD Common Approaches. Category A and B projects as defined in the Common Approaches which are supported with export credit guarantees are reported to the OECD. Here, you will find an overview of the OECD for all member countries.

 

In 2017 13 projects classified as Category A having an order value of 3.2 billion euros and 34 projects classified as Category B having an order value of 2.3 billion euros were supported with an export credit guarantee. Details can be found in the Annual Report 2017.

Supported projects

If the contract value of a project exceeds EUR 15 million, basic project data are published after a final commitment for cover has been made provided that the exporter has given its consent. This information is brought up to date at the beginning of each month however with a time-lag of three months.

The order values are divided into the following categories:

  • Category 1: up to Euro 15 million
  • Category 2: up to Euro 50 million
  • Category 3: up to Euro 100 million
  • Category 4: up to Euro 200 million
  • Category 5: above Euro 200 million

 

Projects supported in previous years can be found in the project archive (German version).

 

List of officially supported projects (as at 31.10.2018)

Exporter: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf

Financial institution:

Commerzbank AG, Frankfurt

Project:

Plant for the production of polypropylene foil

Category:

2

Buyer's Country:

Turkey

Credit period:

8 years

 

Exporter: Reifenhäuser REICOFIL GmbH & Co. KG, Troisdorf

Financial institution:

Landesbank Baden-Württemberg, Stuttgart

Project:

Supply and installation of a spunbond line

Category:

3

Buyer's Country:

Turkey

Credit period:

10 years

 

Exporter: GIM Export Group GmbH & Co. KG, Göttingen

Financial institution:

Commerzbank AG, Frankfurt

Project:

Delivery of plant and equipment for the production of raw MDF/HDF boards and for the finishing of the raw boards

Category:

3

Buyer's Country:

Turkey

Credit period:

10 years

 

Exporter: GIM Export Group GmbH & Co. KG, Göttingen

Financial institution:

UniCredit Bank AG, München

Project:

200 commercial and transport vehicles for the timber industry

Category:

2

Buyer's Country:

Russia

Credit period:

5 years

 

Exporter: Ferrostaal Equipment Solutions GmbH, Hamburg

Financial institution:

Landesbank Hessen-Thüringen Girozentrale, Frankfurt

Project:

BConstruction machinery and building components

Category:

2

Buyer's Country:

Saudi Arabia

Credit period:

2 years

 

Exporter: Ferrostaal Equipment Solutions GmbH, Hamburg

Financial institution:

Landesbank Hessen-Thüringen Girozentrale, Frankfurt

Project:

Construction machinery and building components

Category:

2

Buyer's Country:

Saudi Arabia

Credit period:

7 resp. 3 years

 

Exporter: Diverse

Financial institution:

 Credit Suisse AG, Zürich

Project:

Supply and installation of system components for the construction of a car factory

Category:

5

Buyer's Country:

Vietnam

Credit period:

10 years

 

Exporter: Nikolaus Sorg GmbH & Co. KG, Lohr

Financial institution:

Commerzbank AG, Frankfurt

Project:

Supply and installation of a production line for container glass with filter system

Category:

2

Buyer's Country:

Angola

Credit period:

7 resp. 3 years

Exporter: Various

Financial institution:

KfW IPEX-Bank GmbH, Frankfurt

Project:

Components for a new cruise liner

Category:

4

Buyer's Country:

United States

Credit period:

12 years

 

Exporter: Various

Financial institution:

KfW IPEX-Bank GmbH, Frankfurt

Project:

Components for a new cruise liner

Category:

4

Buyer's Country:

United States

Credit period:

12 years

 

Exporter: Eisenmann Anlagenbau GmbH & Co. KG, Böblingen

Financial institution:

./.

Project:

Supply and installation of system components for the construction of a car  
factory

Category:

3

Buyer's Country:

Vietnam

Credit period:

Near cash terms

 

Exporter: Schuler Pressen GmbH, Göppingen

Financial institution:

./.

Project:

Supply and installation of system components for the construction of a car factory

Category:

2

Buyer's Country:

Vietnam

Credit period:

Near cash terms

 

Exporter: Dürr Systems AG, Bietigheim-Bissingen

Financial institution:

./.

Project:

Supply and installation of system components for the construction of a car factory

Category:

3

 
Buyer's Country: Vietnam

Credit period:

Near cash terms

 

Exporter: DERMALOG Identification Systems GmbH, Hamburg

Financial institution:

./.

Project:

IT infrastructure including biometric  technology

 

Category:

 

3
Buyer's Country: Philippines

Credit period:

Near cash terms

Exporter: GIM Export Group GmbH & Co. KG, Göttingen

Financial institution:

UniCredit Bank AG, München

Project:

Supply of a plant for the production of chip board for the furniture industry and interior fitting of a plant for the production of wooden composite board

Category:

4

Buyer's Country:

United States

Credit period:

8.5 years

 

Exporteur: KRONES AG, Neutraubling

Financial institution:

Landesbank Baden-Württemberg, Leipzig

Project:

Delivery, assembly and commissioning of 2 bottliing plants for beer

Category:

2

Buyer's Country:

Brazil

Credit period:

10 years

 

Exporter: KRONES AG, Neutraubling

Financial institution:

Landesbank Baden-Württemberg, Leipzig

Project:

Delivery, assembly and commissioning of 2 bottliing plants for beer

Category:

2

Buyer's Country:

Brazil

Credit period:

10 years

 

Exporter: ein deutscher Exporteur

Financial institution:

Bayerische Landesbank, München

Project:

Supply of 20 telescopic truck cranes

Category:

2

Buyer's Country:

Saudi Arabia

Credit period:

5 years

 

Exporter: SMS group GmbH, Düsseldorf

Financial institution:

 ./.

Project:

Modernisation of a hot strip mill

Category:

2

Buyer's Country:

India

Credit period:

Near cash terms

 

Exporter: Voith Paper GmbH & Co. KG, Heidenheim

Financial institution:

 ./.

Project:

Delivery and supervision of the assembly of components for two paper machines for the production of packaging paper

Category:

2

Buyer's Country:

Laos, DVR

Credit period:

Near cash terms

 

Exporter: Buss-SMS-Canzler GmbH, Butzbach

Financial institution:

 ./.

Project:

Supply of a sewage sludge drying plant

Category:

2

Buyer's Country:

Hongkong (China, PR)

Credit period:

Near cash terms

Exporter: Linde AG, Pullach

Financial institution:

Deusche Bank AG, Frankfurt

Project:

Ethylene crackers

Category:

5

Buyer's Country:

Russia

Credit period:

10 years

 

Exporter: TAKRAF GmbH, Leipzig

Financial institution:

Crédit Agricole Corporate and Investment Bank, Paris

Project:

1 crushing plant

Category:

3

Buyer's Country:

Russia

Credit period:

10 years

 

Exporter: GE Wind Energy GmbH, Salzbergen

Financial institution:

Bayerische Landesbank, München

Project:

Construction of a wind farm, phase I (100 MW)

Category:

3

Buyer's Country:

Ukraine/Netherlands

Credit period:

9.75 years

 

Exporter: Nordex Energy GmbH, Hamburg

Financial institution:

 KfW, Frankfurt

Project:

Wind farm

Category:

4

Buyer's Country:

Argentinia

Credit period:

15 years

 

Exporter: Primetals Technologies GmbH, Erlangen

Financial institution:

 KfW, Frankfurt

Project:

Hot rolling mill

Category:

2

Buyer's Country:

India

Credit period:

10 years

 

Exporter: MEYER WERFT GmbH & Co. KG

Financial institution:

 KfW IPEX-Bank GmbH, Frankfurt

Project:

Building and delivery of a cruise ship

Category:

5

Buyer's Country:

United Kingdom

Credit period:

12 years

Exporter: A German exporter

Financial institution:

ING Bank, a Department of INGDiBa AG, Frankfurt

Project:

Engineering, supplies and services in connection with the expansion of existing polypropylene plants

Category:

4

Buyer's Country:

United States

Credit period:

8.5 years

 

Exporter: Herrenknecht AG, Schwanau

Financial institution:

Landesbank Baden-Württemberg, Stuttgart

Project:

2 tunnel boring machines

Category:

2

Buyer's country:

Argentina

Credit period:

3.5 years

 

Exporter: A German exporter

Financial institution:

Bremer Kreditbank AG, Bremen

Project:

2 rolling lines for the production of aluminium foil as well as a separator

Category:

2

Buyer's country:

India

Credit period:

8.5 years

 

Exporter: SMS group GmbH, Düsseldorf

Financial institution:

./.

Project:

Supply of a cold rolling mill

Category:

2

Buyer's country:

China, PR

Credit period:

Near cash terms

 

Exporter: SMS group GmbH, Düsseldorf

Financial institution:

 ./.

Project:

Supply of four silicone metal submerged arc furnaces

Category:

2

Buyer's country:

China, PR

Credit period:

Near cash terms

 

Exporter: TAKRAF GmbH, Leipzig

Financial institution:

./.

Project:

Coal-handling equipment for a port terminal

Category:

3

Buyer's Country:

Russia

Credit period:

Near cash terms

 

Exporter: SMS group GmbH, Düsseldorf

Financial institution:

Commerzbank AG, Frankfurt

Project:

Supply of a four-stand tandem hot finishing line for aluminium

Category:

3

Buyer's country:

Greece

Credit period:

8.5 years

 

Exporter: SMS group GmbH, Düsseldorf

Financial institution:

./.

Project:

Modernisation of a hot strip mill

Category:

3

Buyer's country:

Russia

Credit period:

Near cash terms

 

Exporter: Senvion GmbH

Financial institution:

KfW

Project:

Wind farm

Category:

2

Buyer's country:

Argentina

Credit period:

15 years

 

 

Exporter: A German exporter

Financial institution:

Standard Chartered Bank, London

Project:

Supply of commercial vehicles

Category:

2

Buyer's country:

Qatar

Credit period:

4 years

 

Exporter: A German exporter

Financial institution:

KfW IPEX-Bank GmbH, Frankfurt

Project:

Equipment and trains for a metro line

Category:

2

Buyer's country:

India

Credit period:

14 years

 

Exporter: A German exporter

Financial institution:

Commerzbank AG, Frankfurt

Project:

Installation of a wind farm

Category:

2

Buyer's country:

Turkey

Credit period:

13 years

 

Exporter: Acendis Handels GmbH, Hannover

Financial institution:

ING Bank, eine Niederlassung der ING-DiBa AG, Frankfurt

Project:

Complete furnishing of a new hospital with medical and non-medical equipment as well as deliveries to existing hospitals

Category:

2

Buyer's country:

Turkey

Credit period:

9 years

 

Exporter: A German exporter

Financial institution:

HSBC Bank plc., London

Project:

31 wind turbines for the extension of a wind farm

Category:

3

Buyer's Country:

Turkey

Credit period:

15 years

 

Exporter: A German exporter

Financial institution:

ING Bank, eine Niederlassung der ING-DiBa AG, Frankfurt

Project:

Production line for the production of packaging paper

Category:

3

Buyer's country:

Russia

Credit period:

10 years

 

Exporter: Umax Trade GmbH, Frankfurt

Financial institution:

Commerzbank AG, Frankfurt

Project:

Supply of agricultural machinery and construction machinery

Category:

4

Buyer's country:

Turkmenistan

Credit period:

8 years

 

Exporter: Umax Trade GmbH, Frankfurt

Financial institution:

Commerzbank AG, Frankfurt

Project:

Supply of agricultural machinery and construction machinery

Category:

4

Buyer's country:

Turkmenistan

Credit period:

8 years

 

Exporter: Siemens AG, Erlangen

Financial institution:

Deutsche Bank AG, Frankfurt

Project:

Construction of a gas-fired power plant

Category:

4

Buyers country:

Israel

Credit period:

13 years

 

Exporter: SMS group GmbH, Düsseldorf

Financial institution:

./.

Project:

Supply of a two-stand tandem cold rolling mill for aluminium

Category:

2

Buyer's Country:

China, PR

Credit period:

Near cash terms

 

Exporter: MAN Diesel & Turbo SE, Augsburg

Financial institution:

./.

Project:

Construction of a 120 MW diesel power plant

Category:

2

Buyer’s country:

Benin

Credit period:

near cash terms

 

Exporter: Airbus S.A.S.

Financial institution:

KfW IPEX-Bank GmbH, Frankfurt
Deutsche Pfandbriefbank AG, Unterschleißheim

Project:

1 Airbus A330-200 aircraft

Category:

3

Buyer’s country:

Rwanda

Credit period:

12 years

 

Exporter: Airbus S.A.S.

 

Financial institution:

KfW IPEX-Bank GmbH, Frankfurt
Deutsche Pfandbriefbank AG, Unterschleißheim

Project:

1 Airbus A330-200 aircraft

Category:

3

Buyer’s country:

Rwanda

Credit period:

10.8 years

 

Exporter:

Krones AG, Neutraubling

Financial institution:

Deutsches Kreditinstitut

Project:

Extension of an existing brewery

Category:

2

Buyer’s country:

Brasil

Credit period:

9.5 years

 

Exporter:

Lindauer DORNIER Gesellschaft mit beschränkter Haftung, Lindau und Diverse

Financial institution:

Konsortium AKA Ausfuhrkredit-Gesellschaft mit beschränkter Haftung, Frankfurt
und Commerzbank Aktiengesellschaft, Frankfurt

Project:

Expansion of the production capacity for packaging foils

Category:

2

Buyer’s country:

India

Credit period:

10 years

 

Exporter:

Brückner Maschinenbau GmbH & Co. KG, Siegsdorf

Financial institution:

Landesbank Baden-Württemberg, Stuttgart

Project:

Plant for the production of foils

Category:

2

Buyer’s country:

India

Credit period:

10 years

 

Exporter:

Brückner Maschinenbau GmbH & Co. KG, Siegsdorf

Financial institution:

Landesbank Baden-Württemberg, Stuttgart

Project:

1 production plant for biaxially streched polyethylene terephthalate foils (BOPET)

Category:

2

Buyer’s country:

Indonesia

Credit period:

10 years

 

Exporter: Uhde Inventa-Fischer GmbH
v.d. thyssenkrupp Industrial Solutions AG, Dortmund

Financial institution:

./.

Project:

Production plant for textile polyester polymer

Category:

2

Buyer’s country:

Turkey

Credit period:

near cash terms

 

Exporter: Uhde Inventa-Fischer GmbH
v.d. thyssenkrupp Industrial Solutions AG, Dortmund

Financial institution:

./.

Project:

Production plant for textile polyester polymer

Category:

2

Buyer’s country:

Turkey

Credit period:

near cash terms

 

Exporter: a German exporter

Financial institution:

Landesbank Baden-Württemberg, Stuttgart

Project:

Installation of a wind farm

Category:

2

Buyer’s country:

Turkey

Credit period:

10 years

 

Exporter: Lödige Systems GmbH, Warburg

Financial institution:

DZ Bank AG Deutsche Zentralgenossenschaftsbank, Frankfurt

Project:

Construction design, production, delivery, installation and commissioning of an automatic material flow facility for storage, transport and handling of air cargo in a caro terminal (new Istanbul airport) including software for warehouse management and material flow control

Category:

3

Buyer’s country:

Turkey

Credit period:

10 years

 

Exporter: SMS group GmbH, Düsseldorf

Financial institution:

./.

Project:

Supplies and services for the construction of a continuous annealing line

Category:

2

Buyer’s country:

China, PR

Credit period:

near cash terms

 

Exporter:

Voith Paper GmbH & Co. KG

Financial institution:

./.

Project:

Packaging paper machine

Category:

2

Buyer’s country:

China, PR

Credit period:

near cash terms

Exporter: Trüzschler GmbH & Co. KG

Financial institution:

Bankenkonsortium bestehend aus der AKA Ausfuhrkredit-Gesellschaft mit beschränkter Haftung, Frankfurt und der HSH Nordbank AG, Hamburg

Project:

Supply of a spinning mill for the production of cotton yarns

Category:

2

Buyer’s country:

Turkey

Credit period:

10 years

 

Exporter: a German exporter

Financial institution:

KfW IPEX-Bank GmbH, Frankfurt

Project:

Building and delivery of 4 multi-purpose carriers

Category:

3

Buyer’s country:

Ireland

Credit period:

12 years

 

Exporter: a German exporter

Financial institution:

Bayerische Landesbank, München

Project:

Extension of a wind farm

Category:

2

Buyer’s country:

Turkey

Credit period:

15 years

 

Exporter: a German exporter

Financial institution:

Bayerische Landesbank, München

Project:

Installation of a wind farm

Category:

2

Buyer’s country:

Turkey

Credit period:

13 years

 

Exporter: Reifenhäuser REICOFIL GmbH & Co. KG, Troisdorf

Financial institution:

Landesbank Baden-Württemberg, Stuttgart

Project:

Supply and installation of a spunbond line

Category:

2

Buyer’s country:

Egypt

Credit period:

10 years

 

Exporter:MEYER WERFT GmbH & Co. KG, Papenburg

Financial institution:

KfW IPEX-Bank GmbH, Frankfurt

Project:

Building and delivery of cruise ship

Category:

5

Buyer’s country:

United States

Credit period:

12 years

 

Exporter: a German exporter

Financial institution:

AKA Ausfuhrkredit-Gesellschaft mbH, Frankfurt

Project:

Supply of 3 large diesel engines as well as electro-mechanical equipment for a diesel power station

Category:

2

Buyer’s country:

Bangladesh

Credit period:

12 years

 

Exporter: MAN Diesel & Turbo SE, Augsburg

 

Financial institution:

ODDO BHF AG, Frankfurt

Project:

Supply of 6 large diesel engines as well as electro-mechanical equipment for a diesel power station

Category:

2

Buyer’s country:

Bangladesh

Credit period: