Publication of project information

A projects | Covered projects | Project examples

Category A projects before final commitment 2021/2020

Category A projects, i.e. projects which may have serious environmental, social or human rights impacts, are published no later than 30 days before a final decision on the granting of export credit cover is taken. Subsequent firm commitments for cover are not recorded in this list.

Information on Category A projects covered in previous years can be found in the project archive (German version).

The project involves the construction and operation of a new combined-cycle gas turbine power plant with a total generation capacity of approximately 420 MW. The project site is located north of the city of Mymensingh. More detailed information on the environmental, social and human rights aspects can be found in the Environmental Impact Assessment (EIA, PDF 8.81 MB).

The project involves the extraction of natural gas and the production of liquefied natural gas (LNG) on the Gydan Peninsula in northwestern Siberia. Over a period of 20 years, 27.5 billion cubic meters of gas will be extracted annually and 19.8 million tons of liquefied natural gas produced. In addition to the three production lines, the complex includes storage and ship loading facilities, water supply and wastewater treatment plants, waste treatment facilities and a waste landfill, an airport, a 150 km road network and a gas-fired power plant. More information on the environmental and social impacts of the project can be found on the following website: http://arcticspg.ru/

The project consists in the construction and operation of a new heavy fuel oil power plant with a generating capacity of about 150 MW. The project site is located northeast of the town of Sreepur in the Gazipur District.

More detailed information on the environmental, social and human rights aspects of the project can be found in the Environmental Impact Assessment Report, which we can provide on request (e-Mail to: Umwelt@agaportal.de).
 

The project consists in the construction and operation of a plant for the production of propylene oxide using the so-called hydroperoxide-to-propylene oxide (HPPO) process. The project site is located near the city of Zibo in Shandong Province.

If required, additional information on the environmental, social and human rights aspects of the project can be found in the Environmental Impact Assessment Report (EIA, PDF, 1 MB).

The project consists in the construction and operation of a new pulp and paper mill in the established Tieshangang Coastal Industrial Area (TCIA) 45 km east of Beihai City. 

More detailed information on environmental, social and human rights aspects of the project can be found in the Environmental Impact Assessment (EIA, PDF, 54.3 MB). 

The project consists of the construction and operation of a wind farm with 21 wind turbines and a generation capacity of 88 MW. The project is located about 40 km northwest of Dȏng Hà.

Further information on the project’s environmental, social and human rights aspects can be found in the 
Environmental and Social Impact Assessment (ESIA, PDF, 19 MB). 

The project consists of the construction and operation of a wind farm with 12 wind turbines and a generation capacity of 40.8 MW. The project is located about 50 km northwest of Dȏng Hà.

Further information on the project’s environmental, social and human rights aspects can be found in the 
Environmental and Social Impact Assessment (ESIA, PDF, 19 MB). 

The project consists in the construction and operation of a pulp and paper plant with an annual production capacity of 180,000 tons pulp and 450,000 tons paper in an industrial area, located 12 km northeast of the city of Jining.

More detailed information on the environmental, social and human rights aspects of the project can be found in the Environmental Impact Report (PDF, 11.9 MB) and in the Environmental and Social Review Report (PDF, 5.2 MB).
 

The project consists in the construction and operation of casting and rolling complex for steel products to an existing facility of Uzmetkombinat JSC. The site is located in close to the city of Bekabad in the Tashkent region. 

More detailed information on the project’s environmental, social and human rights aspects can be found in the  Environmental Impact Study (PDF, 14.3 MB).

The project consists in the rehabilitation of an approx. 64 km long section of the Eastern Corridor Road (ECR Lot 1). 

More detailed information on the environmental, social and human rights aspects of the project can be found in the Material Draft Report (PDF, 11.7 MB).

The project consists of the construction and operation of a wind farm with 12 wind turbines and a generation capacity of 40.8 MW. The project is located about 60 km northwest of Istanbul.

Further information on the project’s environmental, social and human rights aspects can be found in the Environmental and Social Impact Assessment (ESIA, PDF, 10.8 MB).

The project consists in the construction and operation of the “Amur” Chemical Complex for the production of polyethylene and polypropylene. The site is located in the far east of the Russian Federation in the Amur district appr. 500 km northwest of Vladivostok.

More detailed information on the project’s environmental, social and human rights aspects can be found in the  Environmental and Social Impact Assessment (PDF, 2 MB).

The project consists in the construction and operation of the Bozüyük Wind Farm 80 km southeast of Bursa, with a capacity of 92.5 MW. 

More detailed information on the project’s environmental, social and human rights aspects can be found in the Environmental Impact Assessment (PDF, 19.3 MB).

The project consists in the expansion of a plant for the production of cardboard and packaging paper. The expansion will result in an increase of the production capacity by about 61% from 450,000 to 725,000 tons annually. The project is located in the town of Obbola, some 15 km southeast of Umeå. 

More detailed information on the environmental, social and human rights aspects of the project can be found in the summary of the Environmental Impact Assessment (PDF, 1.93 MB).

The project consists in the construction and operation of a combine cycle power plant with a capacity of 900 MW. The project includes decommissioning of two heavy fuel oil/gas power plant units. The project is located in Port Quasim, Karachi.

More detailed information on the project’s environmental, social and human rights aspects can be found in the Environmental and Social Impact Assessment (ESIA, PDF, 11 MB). 

The project consists in the expansion of a wind farm on the Karaburun peninsula some 50 km west of Izmir, which was put into service at the end of 2013, by 37 additional wind turbines.More detailed information on the project’s environmental, social and human rights aspects can be found in the Non-Technical-Summary (PDF, 1.35 MB).

Supported projects 2021

If the contract value of a project exceeds EUR 15 million, basic project data are published after a final commitment for cover has been made provided that the exporter has given its consent. This information is brought up to date at the beginning of each month however with a time-lag of three months.

The order values are divided into the following categories:

  • Category 1: up to Euro 15 million
  • Category 2: up to Euro 50 million
  • Category 3: up to Euro 100 million
  • Category 4: up to Euro 200 million
  • Category 5: above Euro 200 million

 

Projects supported in previous years can be found in the project archive (German version).

 

List of officially supported projects (as at 31.8.2021)

Exporter: a German exporter
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Construction of a wind farm
Category:2
Buyer's country:Vietnam
Credit period:12 years
Project category according to Common Approaches:   B
International Standards:Weltbank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:      Economic resettlements, impact on the avifauna, occupational health and safety, labour rights, health and safety of the population
Monitoring: yes
 
Exporter: Lindauer DORNIER GmbH, Lindau and three other Exporters
Financial institution:Oldenburgische Landesbank AG, Oldenburg
Project:Supply of a BOPET film production plant including installation supervision and commissioning
Category:2
Buyer's country:India
Credit period:8.5 years
Project category according to Common Approaches:   C
International Standards:./.
Enviromental, social and human rights issues:      ./.
Monitoring:./.
 
Exporter: Lindauer DORNIER GmbH, Lindau
Financial institution:Landesbank Baden-Württemberg, Leipzig
Project:Plant for the production of polyethylene terephthalate film (BOPET)
Category:2
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches:   C
International Standards:./.
Enviromental, social and human rights issues:       ./.
Monitoring:no
 
Exporter: SMS group GmbH, Düsseldorf
Financial institution:./.
Project:Modernisation of a hot strip mill
Category:2
Buyer's country:Russia
Credit period:Near cash terms
Project category according to Common Approaches:   ./.
International Standards:./.
Enviromental, social and human rights issues:      ./.
Monitoring:./.
 
Exporter: Trützschler GmbH & Co. KG, Mönchengladbach
Financial institution:AKA Ausfuhrkredit-Gesellschaft mit beschränkter Haftung, Frankfurt
Project:Textile plant including buiding
Category:3
Buyer's country:Uzbekistan
Credit period:10 years
Project category according to Common Approaches:   B
International Standards:Weltbank Safequard Operational Policies (OP)
Enviromental, social and human rights issues:      Supply chain, working conditions
Monitoring:no
 

Exporter: Brückner Machinenbau GmbH & Co. KG, v.d. Brückner Group GmbH, Siegsdorf
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Plant for the production of biaxially oriented polypropylene oil (BOPP) foil including peripheral and downstream equipment
Category:2
Buyer's country:Indonesia
Credit period:10 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:      ./.
Monitoring: ./.
 
Exporter: J.M. Voith SE & Co. KG, Heidenheim
Financial institution:./.
Project:Paper machine
Category:2
Buyer's country:China, PR
Credit period:Near cash terms
Project category according to Common Approaches:  ./.
International Standards:./.
Enviromental, social and human rights issues:      ./.
Monitoring:./.
 
Exporter: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf
Financial institution:DZ BANK Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Two plants for the production of biaxially oriented polypropylene (BOPP) foil
Category:2
Buyer's country:China, PR
Credit period:10 years
Project category according to Common Approaches:  ./.
International Standards:./.
Enviromental, social and human rights issues:       ./.
Monitoring:./.
 
Exporter: a German exporter
Financial institution:Banco Santander S.A., Madrid
Project:Intralogistic solutions for a distribution centre
Category:2
Buyer's country:Poland
Credit period:5 years
Project category according to Common Approaches:  C
International Standards:./.
Enviromental, social and human rights issues:     ./.
Monitoring:no
 
Exporter: a German exporter
Financial institution:Consortium of banks,  under the aegis of:
Credit Suisse AG, Zürich, (Consortium leader)      (approx. 21,0%) 
Bayerische Landesbank, Munich                            (approx. 15,0%) 
Citibank N.A., London Branch, London                  (approx. 14,5%) 
DZ Bank AG, Frankfurt                                             (approx. 16,5%) 
ING Bank, a branch of ING-DiBa AG, Frankfurt     (approx. 12,5%) 
Landesbank Baden-Württemberg, Stuttgart        (approx. 20,5%)
Project:Supply of trailers with tarpaulin covers and refrigerator trailers
Category:3
Buyer's country:Lithuania
Credit period:5 years
Project category according to Common Approaches:  ./.
International Standards:./.
Enviromental, social and human rights issues:     ./.
Monitoring:./.
 
Exporter: Commit Project Partners GmbH, Berlin
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Supply and installation of equipment for a furniture plant
Category:3
Buyer's country:Lithuania
Credit period:8.5 yeras
Project category according to Common Approaches:  B
International Standards:World Bank 
Enviromental, social and human rights issues:       Supply chain, occupational health and safety
Monitoring:no
 
Exporter: Carl Friederichs GmbH, Frankfurt
Financial institution:Deutsche Bank AG, Frankfurt
Project:112 ambulances
Category:2
Buyer's country:Ghana
Credit period:7 years
Project category according to Common Approaches:  ./.
International Standards:./.
Enviromental, social and human rights issues:      ./.
Monitoring:./.
 

Exporter: SMS group, Düsseldorf
Financial institution:./.
Project:Supply of a section and rail rolling mill
Category:4
Buyer's country:Dubai, UAE
Credit period:Near cash terms
Project category according to Common Approaches:   K
International Standards:./.
Enviromental, social and human rights issues:     Sensitive areas, workers rights
Monitoring: no
 
Exporter: J.M. Voith SE & Co. KG, Heidenheim
Financial institution:./.
Project:Paper machine
Category:2
Buyer's country:China, PR
Credit period:Near cash terms
Project category according to Common Approaches:   ./.
International Standards:./.
Enviromental, social and human rights issues:   ./.
Monitoring:./.
 
Exporter: a German exporter
Financial institution:KfW IPEX-Bank GmbH, Frankfurt
Project:A luxury expedition cruise ship
Category:5
Buyer's country:United Kingdom
Credit period:12 years
Project category according to Common Approaches:   ./.
International Standards:./.
Enviromental, social and human rights issues:    ./.
Monitoring:./.
 
Exporter: J.M. Voith SE & Co. KG, Heidenheim
Financial institution:./.
Project:Paper machine
Category:3
Buyer's country:China, PR
Credit period:Near cash terms
Project category according to Common Approaches:   ./.
International Standards:./.
Enviromental, social and human rights issues:    ./.
Monitoring:./.
 
Exporter: SMS group GmbH
Financial institution:./.
Project:Components for a Steckel rolling mill
Category:2
Buyer's country:China, PR
Credit period:Near cash terms
Project category according to Common Approaches:   ./.
International Standards:./.
Enviromental, social and human rights issues:    ./.
Monitoring:./.
 
Exporter: SMS group GmbH
Financial institution:./.
Project:Hot strip mill
Category:3
Buyer's country:India
Credit period:Near cash terms
Project category according to Common Approaches:   K
International Standards:./.
Enviromental, social and human rights issues:   ./.
Monitoring:no
 
Exporter: a German exporter
Financial institution:Consortium of German banks
Project:Supply of the equipment for a 100 MW diesel power station
Category:2
Buyer's country:Bangladesh
Credit period:9 years
Project category according to Common Approaches:   B
International Standards:General Guidelines, EHS Guidelines for Thermal Power
Enviromental, social and human rights issues:    Air emissions, noise, occupational health and safety, health and safety of the general public
Monitoring:no
 
Exporter: two German exporters
Financial institution:Natixis S.A., Paris, as Hermes-Agent in a banking consortium
Project:Construction and operation of a telecommunications satellite
Category:4
Buyer's country:Malaysia
Credit period:12 years
Project category according to Common Approaches:   ./.
International Standards:./.
Enviromental, social and human rights issues:    ./.
Monitoring:./.
 

Exporter:  a German exporter
Financial institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Plant for the production of biaxially oriented polypropylene films (BOPP)
Category:2
Buyer's country:China, PR
Credit period:10 years
Project category according to Common Approaches:   C
International Standards:./.
Enviromental, social and human rights issues:     ./.
Monitoring: no
 
Exporter:  a German exporter
Financial institution:Landesbank Hessen-Thüringen, Frankfurt
Project:Three plants (lines N, Q und R) for the production of biaxially oriented polyethylene terephthalat films (BOPET) as well as a recycling system
Category:3
Buyer's country:China, PR
Credit period:8.5 years
Project category according to Common Approaches: E
International Standards:./.
Enviromental, social and human rights issues:   Occupational health ans safety
Monitoring:no
 
Exporter: J.M. Voith SE & Co. KG, Heidenheim
Financial institution:./.
Project:Delivery, installation and commissioning of a production plant for packaging paper
Category:4
Buyer's country:Turkey
Credit period:Near cash terms
Project category according to Common Approaches:   K
International Standards:./.
Enviromental, social and human rights issues:    Waste water
Monitoring:no
 
Exporter: Commit Project Partners GmbH, Berlin
Financial institution:Raiffeisen Bank International AG, Vienna
Project:Equipment and machinery for a furniture factory
Category:2
Buyer's country:Lithuania
Credit period:8.5 years
Project category according to Common Approaches:   B
International Standards:World Bank Safeguard Operational Policies
Enviromental, social and human rights issues:   Supply chain, occupational health and safety
Monitoring:no
 
Exporter: SMS group GmbH, Düsseldorf
Financial institution:./.
Project:Engineering, supply of equipment and machinery, technical documentation, installation supervision and commissioning for the modernisation of an existing pickling line / tandem cold rolling mill
Category:2
Buyer's country:Brazil
Credit period:Near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:   ./.
Monitoring:./.
 
Exporter: SMS group GmbH, Düsseldorf
Financial institution:./.
Project:Engineering, supply of equipment and machinery, technical documentation, installation supervision and commissioning for a continuous annealing und galvanisation line
Category:3
Buyer's country:Brazil
Credit period:Near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:   ./.
Monitoring:./.
 

Exporter: Bellmer GmbH, Niefern-Öschelbronn
Financial institution:./.
Project:Supplies and services in connection with the conversion of a paper rmachine
Category:2
Buyer's country:Austria
Credit period:Near cash terms
Project category according to Common Approaches:  E
International Standards:./.
Enviromental, social and human rights issues:   Resource efficiency and prevention of pollution
Monitoring: no
 
Exporter: Nordex Energy SE & Co. KG, Hamburg
Financial institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches:  B
International Standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues: Biodiversity, labour standards, expropriations
Monitoring:no
 
Exporter:  a German exporter
Financial institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Supply of spinning and spooling machines for the production of  
pre-oriented yarns (POY)
Category:2
Buyer's country:China, PR
Credit period:10 years
Project category according to Common Approaches:  B
International Standards:World Bank 
Enviromental, social and human rights issues:Workers' rights and occupational safety
Monitoring:no
 
Exporter: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf
Financial institution:ODDO BHF AG, Frankfurt
Project:Supply of a plant for the production of biaxially oriented polypropylene (BOPP) foil  including services
Category:2
Buyer's country:Nigeria
Credit period:5 years
Project category according to Common Approaches:  C
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:no
 
Exporter: Intec Engineering GmbH, Bruchsal
Financial institution:ODDO BHF AG, Frankfurt
Project:Biomass power plant
Category:2
Buyer's country:Turkey
Credit period:7 years
Project category according to Common Approaches: B
International Standards:World Bank Safeguard Operational Policies
Enviromental, social and human rights issues:Waste recycling
Monitoring:no
 
Exporter: GE Wind Energy GmbH, Salzbergen
Financial institution:Commerzbank AG, Frankfurt
Project:Supply, installation and commissioning of 14 wind turbines for a wind farm
Category:2
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches: B
International Standards:World Bank 
Enviromental, social and human rights issues:Impact on bird and bat species, occupational safety, expropriations
Monitoring:yes
 
Exporter: GE Wind Energy GmbH, Salzbergen
Financial institution:Commerzbank AG, Frankfurt
Project:Supply, installation and commissioning of 14 wind turbines for a wind farm
Category:2
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches: B
International Standards:World Bank 
Enviromental, social and human rights issues: Impact on bird and bat species, impact on the population, occupational safety, expropriations
Monitoring:yes
Exporter: Reifenhäuser Reicofil GmbH und Co. KG, Troisdorf
Financial institution:HSBC Trinkhaus & Burkhardt AG, Düsseldorf
Project:Plant for the production of filter fleece and a production line for spun-bonded fabric
Category:2
Buyer's country:Brazil
Credit period:10 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter: GIM Export Group GmbH, Co. KG, Göttingen
Financial institution:Landesbank Hessen-Thüringen Girozentrale, Frankfurt
Project:Modernisation of existing chipboard and MDF board plants
Category:2
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter:  a German exporter
Financial institution:AKA Ausfuhrkredit-Gesellschaft mit beschränkter Haftung, Frankfurt
Project:Production plant for BOPET foil
Category:2
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches: C
International Standards:./.
Enviromental, social and human rights issues: ./.
Monitoring:no
 
Exporter: Nordex Energy SE & Co. KG, Hamburg
Financial institution:Norddeutsche Landesbank, Hannover
Project:Construction of a wind farm
Category:4
Buyer's country:Finland
Credit period:15 years
Project category according to Common Approaches: B
International Standards:IFC Performance Standards
Enviromental, social and human rights issues:none
Monitoring:no
 

Exporter: Engineering Dobersek GmbH, Mönchengladbach
Financial institution:./.
Project:Plant for the production of nickel cathodes
Category:2
Buyer's country:Russia
Credit period:7 yeras
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring: ./.
 
Exporter: Richard Kablitz GmbH, Lauda-Königshofen
Financial institution:a German bank
Project:Supply, installation and commissioning of a biomass power plant
Category:2
Buyer's country:Belarus
Credit period:7 yeras
Project category according to Common Approaches: B
International Standards:World Bank
Enviromental, social and human rights issues:Raw materials supply
Monitoring: no
 
Exporter: Engineering DOBERSEK GmbH, Mönchengladbach
Financial institution:./.
Project:Supplies and services for a crushing and classification plant
Category:2
Buyer's country:Russia
Credit period:Near cash terms
Project category according to Common Approaches: K
International Standards:./.
Enviromental, social and human rights issues:Biodiversity, health and safety of the population
Monitoring: no
 
Exporter: Ferrostaal Equipment Solutions GmbH, Hamburg
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Machinery for the manufacture of packaging
Category:2
Buyer's country:UAE Umm al Qaiwain
Credit period:10 yeras
Project category according to Common Approaches: C
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring: no
 
Exporter: Textima Export Import GmbH, Berlin
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Machines for the production of nonwovens
Category:3
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches: C
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:no
 
Exporter: SMS group GmbH, Düsseldorf
Financial institution:Consortium of banks,  under the aegis of  UniCredit Bank AG, München and DZ Bank AG Deutsche Zentral-Genossenschaftsbank, Frankfurt am Main
Project:Delivery, installation and commissioning of a medium section mill (rolling mill)
Category:3
Buyer's country:Italy
Credit period:8.5 years
Project category according to Common Approaches:E
International Standards:./.
Enviromental, social and human rights issues:CO2 emissions
Monitoring:no
 
Exporter: GIM Export Group GmbH & Co. KG, Göttingen
Financial institution:Raiffeisen Bank International AG, Wien
Project:Supply of a plant for the production of chip boards
Category:3
Buyer's country:Ukraine
Credit period:10 years
Project category according to Common Approaches: B
International Standards:World Bank
Enviromental, social and human rights issues:Sourcing of raw materials, air emissions
Monitoring:no
 
Exporter: a German exporter
Financial institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Extruders with pelleting system
Category:2
Buyer's country:China, PR
Credit period:10 years
Project category according to Common Approaches: B
International Standards:IFC Performance Standards (PS)
Enviromental, social and human rights issues:Air emissions, waste water, handling of hazardous materials, occupational health and safety
Monitoring:no
 
Exporter: a German exporter
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Textil machines for synthetic yarns
Category:2
Buyer's country:China, PR
Credit period:10 years
Project category according to Common Approaches: E
International Standards:./.
Enviromental, social and human rights issues:Occupational health and safety, air and noise emissions, waste management
Monitoring:no
 
Exporter: a German exporter
Financial institution:AKA Ausfuhrkredit-Gesellschaft mbH, Frankfurt
Project:Supply of 6 large diesel engines as well as electro-mechanical equipment
Category:2
Buyer's country:Bangladesh
Credit period:12 years
Project category according to Common Approaches: B
International Standards:World Bank
Enviromental, social and human rights issues:Air emissions, noise, occupational health and safety, health and safety of the population
Monitoring:no
 
Exporter: a German exporter
Financial institution:Landesbank Baden-Württemberg, Leipzig
Project:Plant for the manufacture of packaging papers
Category:2
Buyer's country:China, PR
Credit period:10 years
Project category according to Common Approaches: A
International Standards:IFC Performance Standards (PS)
Enviromental, social and human rights issues:Air and noise emissions, energy and water consumption, waste water, safety 
of the populatiion, resettlements and expropriation as well as soucing of raw materials
Monitoring:yes
 
Exporter: Ferrostaal Equipment Solutions GmbH, Hamburg
Financial institution:Landesbank Baden-Württemberg, Leipzig
Project:Supply of spinning machines including services
Category:2
Buyer's country:Bangladesh
Credit period:10 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter: Siemens AG, Erlangen
Financial institution:Deutsche Bank AG, Frankfurt
Project:Turnkey construction of a combined gas and steam power plant
Category:4
Buyer's country:Russia
Credit period:12 yeras
Project category according to Common Approaches: B
International Standards:World Bank
Enviromental, social and human rights issues:Air emissions
Monitoring:no
 

Exporter: a German exporter
Financial institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt am Main
Project:Installation of a wind farm
Category:2
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches: B
International Standards:World Bank Safeguard Operational Policies
Enviromental, social and human rights issues:Flora and fauna
Monitoring: yes
 
Exporter: Ferrostaal Equipment Solutions GmbH, Hamburg
Financial institution:Landesbank Hessen-Thüringen Girozentrale, Frankfurt
Project:Supply and installation of cranes and transport machinery
Category:2
Buyer's country:Dubai, UAE
Credit period:10 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring: ./.
 
Exporter: Brückner Maschinenbau GmbH & Co. KG, v.d. Brückner Group GmbH, Siegsdorf
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:BOPET film plant
Category:2
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches: E
International Standards:./.
Enviromental, social and human rights issues:Air emissions, waste, waste water
Monitoring:no
 
Exporter: SMS group GmbH, Düsseldorf
Financial institution:./.
Project:Expansion of a hot strip plant
Category:2
Buyer's country:Turkey
Credit period:Near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter: J.M. Voith SE & Co. KG, Heidenheim
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Paper machine
Category:2
Buyer's country:China, PR
Credit period:Near cash terms
Project category according to Common Approaches: K
International Standards:./.
Enviromental, social and human rights issues:Wood supply chain and waste water
Monitoring:no
 

Exporter: thyssenkrupp Industrial Solutions AG, Essen
Financial institution:a German bank
Project:Extension of a coal terminal
Category:3
Buyer's country:Russia
Credit period:10 years
Project category according to Common Approaches:B
International Standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Dust emissions, offshore dredging, occupational health and safety
Monitoring: no

 
Exporter: Nordex Energy SE & Co. KG, Hamburg
Financial institution:Commerzbank AG, Frankfurt
Project:Delivery, installation and commissioning of 9 wind turbines with a capacity of  4.0-4.5 MW each for the establishment of the wind farm "Atakale"
Category:2
Buyer's country:Turkey
Credit period:14 years
Project category according to Common Approaches:B
International Standards:World Bank 
Enviromental, social and human rights issues:Impacts on flora and fauna
Monitoring: no
 
Exporter: Trützschler GmbH & Co. KG, Mönchengladbach
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Textile plant
Category:2
Buyer's country:Uzbekistan
Credit period:10 years
Project category according to Common Approaches: B
International Standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Occupational health and safety and work standards, community health and safety
Monitoring: no
 
Exporter: Oerlikon Textile GmbH & Co. KG, Remscheid
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Spinning and spooling machines
Category:2
Buyer's country:India
Credit period:10 yeras
Project category according to Common Approaches: E
International Standards:./.
Enviromental, social and human rights issues:Fire protection
Monitoring:no