Category A projects before final commitment 2020

Category A projects, i.e. projects which may have serious environmental, social or human rights impacts, are published no later than 30 days before a final decision on the granting of export credit cover is taken. Subsequent firm commitments for cover are not recorded in this list.

Information on Category A projects covered in previous years can be found in the project archive (German version).

The project consists in the construction and operation of a pulp and paper plant with an annual production capacity of 180,000 tons pulp and 450,000 tons paper in an industrial area, located 12 km northeast of the city of Jining.

More detailed information on the environmental, social and human rights aspects of the project can be found in the Environmental Impact Report (PDF, 11,9 MB) and in the Environmental and Social Review Report (PDF, 5,2 MB).
 

The project consists in the construction and operation of casting and rolling complex for steel products to an existing facility of Uzmetkombinat JSC. The site is located in close to the city of Bekabad in the Tashkent region. 

More detailed information on the project’s environmental, social and human rights aspects can be found in the  Environmental Impact Study (PDF, 14,3 MB).

The project consists in the rehabilitation of an approx. 64 km long section of the Eastern Corridor Road (ECR Lot 1). 

More detailed information on the environmental, social and human rights aspects of the project can be found in the Material Draft Report (PDF, 11,7 MB).

The project consists of the construction and operation of a wind farm with 12 wind turbines and a generation capacity of 40.8 MW. The project is located about 60 km northwest of Istanbul.

Further information on the project’s environmental, social and human rights aspects can be found in the Environmental and Social Impact Assessment (ESIA, PDF, 10.8 MB).

The project consists in the construction and operation of the “Amur” Chemical Complex for the production of polyethylene and polypropylene. The site is located in the far east of the Russian Federation in the Amur district appr. 500 km northwest of Vladivostok.

More detailed information on the project’s environmental, social and human rights aspects can be found in the  Environmental and Social Impact Assessment (PDF, 2 MB).

The project consists in the construction and operation of the Bozüyük Wind Farm 80 km southeast of Bursa, with a capacity of 92.5 MW. 

More detailed information on the project’s environmental, social and human rights aspects can be found in the Environmental Impact Assessment (PDF, 19.3 MB).

The project consists in the expansion of a plant for the production of cardboard and packaging paper. The expansion will result in an increase of the production capacity by about 61% from 450,000 to 725,000 tons annually. The project is located in the town of Obbola, some 15 km southeast of Umeå. 

More detailed information on the environmental, social and human rights aspects of the project can be found in the summary of the Environmental Impact Assessment (PDF, 1.93 MB).

The project consists in the construction and operation of a combine cycle power plant with a capacity of 900 MW. The project includes decommissioning of two heavy fuel oil/gas power plant units. The project is located in Port Quasim, Karachi.

More detailed information on the project’s environmental, social and human rights aspects can be found in the Environmental and Social Impact Assessment (ESIA, PDF, 11 MB). 

The project consists in the expansion of a wind farm on the Karaburun peninsula some 50 km west of Izmir, which was put into service at the end of 2013, by 37 additional wind turbines.More detailed information on the project’s environmental, social and human rights aspects can be found in the Non-Technical-Summary (PDF, 1,35 MB).

Reporting to the OECD

The publication of Category A and B projects for which cover has been granted is part of the rules laid down by the OECD Common Approaches. Category A and B projects as defined in the Common Approaches which are supported with export credit guarantees are reported to the OECD. Here, you will find an overview of the OECD for all member countries.

In 2019 10 projects classified as Category A having an order value of 4.9 billion euros and 26 projects classified as Category B having an order value of 1.5 billion euros were supported with an export credit guarantee. Details can be found in the Annual Report 2019.

Supported projects 2020

If the contract value of a project exceeds EUR 15 million, basic project data are published after a final commitment for cover has been made provided that the exporter has given its consent. This information is brought up to date at the beginning of each month however with a time-lag of three months.

The order values are divided into the following categories:

  • Category 1: up to Euro 15 million
  • Category 2: up to Euro 50 million
  • Category 3: up to Euro 100 million
  • Category 4: up to Euro 200 million
  • Category 5: above Euro 200 million

 

Projects supported in previous years can be found in the project archive (German version).

 

List of officially supported projects (as at 31.9.2020)

Exporter: GE Wind Energy GmbH, Salzbergen
Financial institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:15 yeras
Project category according to Common Approaches: A
International Standards:World Bank Environmental and Social Standards (WB ESS)
Enviromental, social and 
human rights issues:
Economic displacement, project impact on biodiversity
Monitoring:Yes
 
Exporter: GE Wind Energy GmbH, Salzbergen
Financial institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:15 yeras
Project category according to Common Approaches: B
International Standards:World Bank Environmental and Social Standards (WB ESS)
Enviromental, social and 
human rights issues:
Project impact on biodiversity, occupational health and safety, potentially  
economic displacement
Monitoring:Yes
 
Exporter: A German exporter
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Equipment for the production of container glass                     
Category:2
Buyer's country:Uzbekistan
Credit period:6 years
Project category according to Common Approaches: B
International Standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and 
human rights issues:
Air emissions
Monitoring:No
 
Exporter: Two German exporters
Financial institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Port cranes
Category:2
Buyer's country:Guatemala
Credit period:7.5 years 
Project category according to Common Approaches: E
International Standards:./.
Enviromental, social and 
human rights issues:
Occupational health and safety and impacts on local residents
Monitoring:No
 

Exporter: A German exporter
Financial institution:Consortium of banks,  under the aegis of 
HSBC Bank Middle East Limited, Dubai (VAE) and Credit Agricole Corporate and Investment Bank, Montrouge
Project:600 buses
Category:4
Buyer's country:Saudi Arabia
Credit period:7.5 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter: A German exporter
Financial institution:Consortium of banks,  under the aegis of: 
HSBC Bank Middle East Limited, Dubai (VAE)  
and Credit Agricole Corporate and Investment Bank, Montrouge
Project:242 buses
Category:2
Buyer's country:Saudi Arabia
Credit period:7.5 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter: GE Wind Energy GmbH, Salzbergen
Financial institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:15 years
Project category according to Common Approaches: B
International Standards:World Bank Environmental and Social Standards (WB ESS)
Enviromental, social and human rights issues:Health and safety of the general public, impact on flora and fauna, occupational health and safety
Monitoring:Yes
 
Exporter: A German exporter
Financial institution:Landesbank Hessen-Thüringen Girozentrale, Frankfurt
Project:Construction of a wind farm
Category:3
Buyer's country:Turkey
Credit period:10 years 
Project category according to Common Approaches: A
International Standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Impact on biodiversity, expropriations
Monitoring:Yes
 
Exporter: S & R Maschinenbau GmbH, Homberg
Financial institution:./.
Project:Supply of 100.000 self-sufficient solar energy modules, "Solar Home Systems",  for the decentralised energy supply to individual households
Category:3
Buyer's country:Ethiopia
Credit period:Near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter: J.M. Voith SE & Co. KG, Heidenheim
Financial institution:./.
Project:Key components for a carton line
Category:3
Buyer's country:China, PR
Credit period:Near cash terms
Project category according to Common Approaches: K
International Standards:./.
Enviromental, social and human rights issues:Air emissions, waste water, wood supply chain
Monitoring:No
 
Exporter: A German exporter
Financial institution:ODDO BHF Aktiengesellschaft, Frankfurt
Project:Mobile telescopic cranes
Category:2
Buyer's country:Saudi Arabia
Credit period:8 years 
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

Exporter: Nordex Energy GmbH, Hamburg
Financial institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Construction of a wind farm
Category:3
Buyer's country:Turkey
Credit period:7 years
Project category according to Common Approaches: B
International Standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Flicker, expropriations
Monitoring:Yes

 
Exporter: GIM Export Group GmbH & Co. KG, Göttingen
Financial institution:ING Bank, a branch office of ING-DiBa AG, Frankfurt
Project:Modernisation of two existing chipboard plants
Category:2
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches: E
International Standards:./.
Enviromental, social and human rights issues:Occupational health and safety
Monitoring:No
 
Exporter: Linde AG, Pullach
Financial institution:./.
Project:Ethylene plant
Category:5
Buyer's country:Russia/China, PR
Credit period:Near cash terms respectively 10 years credit
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 

Exporter: SIEMAG TEBERG GmbH, Haiger
Financial institution:./.
Project:Supply, installation and commissioning of material handling equipment for two shafts of a potash salt mine
Category:2
Buyer's country:Russia
Credit period:Near cash terms
Project category according to Common Approaches: K
International Standards:./.
Enviromental, social and human rights issues:Economic resettlements, wastewater, occupational health and safety
Monitoring:No
  
Exporter: A German exporter
Financial institution:Landesbank Hessen-Thüringen Girozentrale, Frankfurt
Project:Construction of a wind farm
Category:3
Buyer's country:Tukey
Credit period:10 years
Project category according to Common Approaches: B
International Standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Impacts on flora and fauna
Monitoring:No

 
Exporter: A German exporter
Financial institution:Consortium of banks, under the aegis of BNP Paribas Fortis SA/NV, Brussels 
c/o BNP Paribas S.A., Frankfurt
Project:Supply of 2 converter stations for a high-voltage direct-current cable
Category:5
Buyer's country:United States
Credit period:5 years
Project category according to Common Approaches: :B
International Standards:IFC Performance Standards (PS)
Enviromental, social and human rights issues:Potential impacts on protected areas
Monitoring:No
 
Exporter: A German exporter
Financial institution:Danske Bank A/S, Copenhagen
Project:Supply of a paper machine including services
Category:5
Buyer's country:Sweden
Credit period:8,5 years
Project category according to Common Approaches: A
International Standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Raw materials supply chain, wastewater
Monitoring:No
 
Exporter: A German exporter
Financial institution:Landesbank Hessen-Thüringen, Frankfurt
Project:Supply, installation and commissioning of 16 wind turbines with a capacity of 5,3 MW each for the construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches: B
International Standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Impact of noise and flicker, occupational health and safety, expropriation
Monitoring:Yes
 
Exporter: A German exporter
Financial institution:IKB Deutsche Indurstriebank AG, Düsseldorf
Project:Production lines for steel pistons
Category:2
Buyer's country:Turkey
Credit period:8,5 years
Project category according to Common Approaches: E
International Standards:./.
Enviromental, social and human rights issues:Impacts on local residents
Monitoring:No
 
Exporter: J.M. Voith SE & Co. KG, Heidenheim
Financial institution:./.
Project:Services in connection with the supply of a paper machine
Category:2
Buyer's country:China, PR
Credit period:Near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter: A German exporter
Financial institution:Landesbank Hessen-Thüringen Girozentrale, Frankfurt
Project:Construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches: B
International Standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Health and safety of the general public
Monitoring:No
 
Exporter: Brückner Maschinenbau GmbH & Co. KG, v.d. Brückner Group GmbH, Siegsdorf
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Supplies and services for a plant for the production of biaxially stretched 
polyethylene terephthalate film (BOPET film)
Category:2
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches: B
International Standards:World Bank 
Enviromental, social and human rights issues:Air emissions
Monitoring:No
 
Exporter: Brückner Maschinenbau GmbH & Co. KG, v.d. Brückner Group GmbH, Siegsdorf
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Supplies and services for a plant for the production of biaxially stretched 
polyethylene terephthalate film (BOPET film)
Category:2
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches: B
International Standards:World Bank 
Enviromental, social and human rights issues:Air emissions
Monitoring:No
 
Exporter: Nordex Energy GmbH, Hamburg
Financial institution:Coöperatieve Rabobank U.A., Utrecht, Netherlands
Project:Construction of a wind farm
Category:5
Buyer's country:Norway
Credit period10 years
Project category according to Common Approaches: B
International Standards:IFC Performance Standards
Enviromental, social and human rights issues:Impacts of indigenous people
Monitoring:Yes
 
Exporter: SMS group GmbH, Düsseldorf
Financial institution:./.
Project:Rehabilitation of a cold rolling mill
Category:2
Buyer's country:Russia
Credit period:Near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

Exporter: GE Wind Energy GmbH, Salzbergen
Financial institution: KfW IPEX-Bank GmbH, Frankfurt
Project: Construction of a wind farm
Category: 2
Buyer's country: Turkey
Credit period: 15 years
Project category according to Common Approaches:  B
International Standards: World Bank Environmental and Social Standards (WB ESS)
Enviromental, social and human rights issues: Economic resettlements, impacts of the project on the biodiversity
Monitoring: No
 
Exporter: Nordex Energy GmbH, Hamburg
Financial institution: Landesbank Baden-Württemberg
Project: Delivery, installation and commissioning of 9 wind turbunes with a capacity of 3.9 MW each for the establishment of a wind farm
Category: 2
Buyer's country: Turkey
Credit period: 11 years
Project category according to Common Approaches:  E
International Standards: ./.
Enviromental, social and human rights issues: Occupational health and safety
Monitoring: No
 

Exporter: Voith Hydro GmbH & Co. KG, Heidenheim
Financial institution:./.
Project:Rehabilitation of an existing hydroelectric power station
Category:2
Buyer's country:Togo
Credit period:Near cash terms
Project category according to Common Approaches: K
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter: Ferrostaal Equipment Solutions GmbH, Hamburg
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Various cranes and heavy duty modules
Category:2
Buyer's country:Indonesia
Credit period:8,5 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter: A German exporter
Financial institution:ING Bank, a branch office of ING-DiBa AG, Frankfurt
Project:Supply, installation and commissioning of an air separation plant
Category:2
Buyer's country:Russia
Credit period:10 years
Project category according to Common Approaches: A
Interational Standards:World Bank
Enviromental, social and human rights issues:Air emissions, waste water, occupational health and safety
Monitoring:No
 
Exporter: A German exporter
Financial institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:4 DWE MMA oxidation reactors
Category:2
Buyer's country:China, PR
Credit period:10 years
Project category according to Common Approaches: UWB
International Standards:IFC Performance Standards (PS)
Enviromental, social and human rights issues:Air emissions, waste water, labour rights
Monitoring:Yes
 
Exporter: GE Wind Energy GmbH, Salzbergen
Financial institution:DZ BANK Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Construction of a wind farm
Category:3
Buyer's country:Turkey
Credit period:14 yeras
Project category according to Common Approaches: B
International Standards:IFC Performance Standards (PS) as well as World Bank, IFC Environmental, Health and Safety (EHS) Guidelines
Enviromental, social and human rights issues:Impacts on flora and fauna, economic displacements
Monitoring:No
 
Exporter: A German exporter
Financial institution::Oldenburgische Landesbank Aktiengesellschaft, Bremen
Project:Aluminium foil rolling line with peripheral systems
Category:2
Buyer's country:India
Credit period:8.5 years
Project category according to Common Approaches: B
International Standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Air emissions, occupational health and safety
Monitoring:No
 
Exporter: Brückner Maschinenbau GmbH & Co. KG, v.d. Brückner Group GmbH, Siegsdorf
Financial institution:DZ BANK AG, Frankfurt
Project:Supply of a BOPP speciality film line with additional equipment including installation supervision
Category:2
Buyer's country:Indonesia
Credit period:10 years
Project category according to Common Approaches: C
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

Exporter: Dieffenbacher GmbH, Eppingen
Financial institution: DZ BANK AG, Frankfurt
Project: Production line for MDF/HDF wooden composite boards
Category: 2
Buyer's country: Turkey
Credit period: 7 years
Project category according to Common Approaches:  B
International Standards: World Bank Safeguard Operational Policies
Enviromental, social and human rights issues: Supply chain, air emissions, occupational health and safety
Monitoring: Yes
 
Exporter: "FAMAKO" Anlagenexport GmbH, Berlin
Financial institution: ./.
Project: A plant for the drying of potash
Category: 2
Buyer's country: China, PR
Credit period: Near cash terms
Project category according to Common Approaches:  K
International Standards: ./.
Enviromental, social and human rights issues: ./.
Monitoring: No
 
Exporter: "FAMAKO" Anlagenexport GmbH, Berlin
Financial institution: ./.
Project: A plant for the crystallisation of potash
Category: 4
Buyer's country: China, PR
Credit period: Near cash terms
Project category according to Common Approaches:  K
International Standards: ./.
Enviromental, social and human rights issues: ./.
Monitoring: No
 
Exporter: A German exporter
Financial institution: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project: Supply, installation and commissioning of 25 wind turbines for the establishment of a wind farm
Category: 2
Buyer's country: Turkey
Credit period: 13 years
Project category according to Common Approaches:  B
International Standards: World Bank / IFC Environmental, Health and Safety (EHS) Guidelines
Enviromental, social and human rights issues: Impacts on flora and fauna, economic displacement
Monitoring: No
 
Exporter: Nordex Energy GmbH, Hamburg
Financial institution: Bayerische Landesbank, Munich
Project: Supply, installation and commissioning of 23 wind turbines with a capcity
of 4.0 - 4.5 MW each for the establishement of a wind farm
Category: 2
Buyer's country: Turkey
Credit period: 8 years
Project category according to Common Approaches:  B
International Standards: World Bank
Enviromental, social and human rights issues: Impacts on birds and bats, occupational health and safety, expropriations
Monitoring: Yes

Exporter: Siemens AG, Erlangen
Financial institution: Deutsche Bank AG, Frankfurt
Project: Machinery and equipment for the production of aluminium wheels
Category: 5
Buyer's country: Iraq
Credit period: 5 years
Project category according to Common Approaches:  A
International Standards: IFC Performance Standards (PS)
Enviromental, social and human rights issues: Potential risks in connection with the transmission lines
Monitoring: Yes
 
Exporter: Linde AG Engineering Division, Pullach
Financial institution: ING Bank, a branch office of ING-DiBa AG, Frankfurt as Euler Hermes Agent
Project: Gas processing complex
Category: 5
Buyer's country: Russia
Credit period: 13,5 years
Project category according to Common Approaches:  A
International Standards: IFC
Enviromental, social and human rights issues: ESIA, ESDD
Monitoring: Yes
 
Exporter: A German exporter
Financial institution: Landesbank Baden-Württemberg, Leipzig
Project: Machinery and equipment for the production of aluminium wheels
Category: 2
Buyer's country: Turkey
Credit period: 10 years
Project category according to Common Approaches:  B
International Standards: World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues: Air emissions
Monitoring: No
 
Exporter: GIM Export Group GmbH & Co. KG, Göttingen
Financial institution: ING Bank, Frankfurt
Project: Production line for MDF/HDF board and laminate flooring
Category: 3
Buyer's country: Russia
Credit period: 10 years
Project category according to Common Approaches:  B
International Standards: General Guidelines, Guidelines for Board and Particle-Based Products
Enviromental, social and human rights issues: Protests, air emissions and timber production in the supply chain
Monitoring: No
 
Exporter: A German exporter
Financial institution: Commerzbank AG, Frankfurt
Project: Axles, components and prefabricated parts for the production of trailers/ semitrailers for lorries
Category: 2
Buyer's country: Turkey
Credit period: 5 years
Project category according to Common Approaches:  ./.
International Standards: ./.
Enviromental, social and human rights issues: ./.
Monitoring: ./.

Siemens AG
Financial institution:KfW IPEX-Bank GmbH
Project:Combined cycle power plant and an LNG terminal
Category:5
Buyer's country:Brasil
Credit period:12 years
Project category according to Common Approaches:  A
International Standards:IFC Performance Standards
Enviromental, social and human rights issues:Sensitive areas, resettlements, air emission
Monitoring:Yes
 
SMS group GmbH Düsseldorf
Financial institution:./.
Project:Forging press
Category:2
Buyer's country:China, PR
Credit period:Near cash terms
Project category according to Common Approaches:  ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter: A German exporter
Financial institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:15 years
Project category according to Common Approaches:  B
International Standards:World Bank
Enviromental, social and human rights issues:Impacts on the avifauna
Monitoring:No
 
Exporter: J.M. Voith SE & Co. KG
Financial institution: ./.
Project: Supply of a production line for packaging paper
Category: 4
Buyer's country: Russia
Credit period: Near cash terms
Project category according to Common Approaches:  K
International Standards: ./.
Enviromental, social and human rights issues: Timber supply chain and waste water
Monitoring: No
 
Exporter: MEYER WERFT GmbH & Co. KG, Papenburg
Financial institution: KfW IPEX-Bank GmbH, Frankfurt
Project: Construction and delivery of a cruise ship
Category: 5
Buyer's country: Italy
Credit period: 12 years
Project category according to Common Approaches:  ./.
International Standards: ./.
Enviromental, social and human rights issues: ./.
Monitoring: ./.
 
Exporter: NEPTUN WERFT GmbH & Co. KG, Rostock
Financial institution: KfW IPEX-Bank GmbH, Frankfurt
Project: River cruise ships
Category: 4
Buyer's country: Switzerland
Credit period: 8.5 years
Project category according to Common Approaches:  ./.
International Standards: ./.
Enviromental, social and human rights issues: ./.
Monitoring: ./.
 
Exporter: UMAX Trade GmbH, Frankfurt
Financial institution: Commerzbank AG, Frankfurt
Project: Supply of agricultural machinery and construction machinery including 
training and the expansion of service centres
Category: 4
Buyer's country: Turkmenistan
Credit period: 8 years
Project category according to Common Approaches:  B
International Standards: IFC Performance Standards
Enviromental, social and human rights issues: Water management, child and forced labour
Monitoring: No
 
Exporter: GE Wind Energy GmbH, Salzbergen
Financial institution: Erste Group Bank AG, Wien
Project: Construction of a wind farm
Category: 3
Buyer's country: Kosovo
Credit period: 11 years
Project category according to Common Approaches:  ./.
International Standards: ./.
Enviromental, social and human rights issues: ./.
Monitoring: ./.
 
Exporter: GE Wind Energy GmbH, Salzbergen und General Electric international Inc. Sucursal Argentina
Financial institution: BNP Paribas Fortis S.A./N.V., Brussels
Project: Wind farm
Category: 3
Buyer's country: Argentina
Credit period: 14 years
Project category according to Common Approaches:  B
International Standards: IFC Performance Standards
Enviromental, social and human rights issues: Birds, occupational health and safety
Monitoring: No