
Publication of project information
Category A projects before final commitment 2021/2022
Category A projects, i.e. projects which may have serious environmental, social or human rights impacts, are published no later than 30 days before a final decision on the granting of export credit cover is taken. Subsequent firm commitments for cover are not recorded in this list.
Information on Category A projects covered in previous years can be found in the project archive (German version).
The project consists of the construction and operation of a double-track high-speed train network for passenger and freight transport. In total, the construction of three lines is planned, the present project includes the so-called "Green Line". The 660km route of the "Green Line" goes from El Ain El Sokhna City on the Red Sea Coast to Marsa Matrouh, on the Mediterranean Coast.
More information on the environmental, social and human rights aspects of the project can be found in the Non-Technical Summary (PDF, 530 KB).
The project comprises the construction and operation of a wind farm with 23 wind turbines and a generation capacity of 100 MW. The project site is located approximately 60 km northwest of the city of Bursa. More information on the environmental, social and human rights aspects of the project can be found in the Environmental Impact Assessment (EIA, PDF, 4 MB).
The project comprises the construction and operation of a wind farm with 18 wind turbines and a generation capacity of 72 MW. The project site is located approximately 60 km northwest of the city of Bursa. More information on the environmental, social and human rights aspects of the project can be found in the Environmental Impact Assessment (EIA, PDF, 7.2 MB).
The project involves the construction and operation of a new combined-cycle gas turbine power plant with a total generation capacity of approximately 1,560 MW. The project site is located north of the city of Termez.
For more information on the environmental, social and human rights aspects of the project, please refer to the Environmental and Social Impact Assessment (ESIA, PDF, 19.4 MB).
The project Helios involves the construction and operation of a plant for the production of green hydrogen, which will be further processed into green ammonia for better transport properties. The total annual production capacity will be 1.16 million tonnes of ammonia. The project is planned within the Neom planning region in the northwest of Saudi Arabia. Energy will be supplied by a solar park with a capacity of 2.2 GW in the east and a wind park with a capacity of 1.67 GW in the north of the Neom planning region. The ammonia production site is located near Duba in the south of the Neom region.
More detailed information on the environmental, social and human rights aspects of the project, please refer to the summaries of the Environmental Impact Assessment Reports Part 1 (PDF, 963 KB), Part 2 (PDF, 887 KB) and Part 3 (PDF, 1,88 MB).
The project involves the construction and operation of a plant for the production of polyamide pellets (raw material for the production of nylon 6 and nylon 66). The total annual production capacity will be 600,000 tons (400,000 tons of nylon 6 and 200,000 tons of nylon 66). The project is located in Yichang, about 60 km west of Jingzhou city.
For more information on the environmental, social and human rights aspects of the project, please refer to the summary of the Environmental Impact Assessment (EIA, PDF, 0,8 MB).
The project involves the construction and operation of a fertilizer and a phosphoric acid plant for the annual production of up to 460,000 tons di-ammonium-phosphate fertilizer or up to 1.1 million tons of multi-nutrient fertilizer and 210,000 tons of phosphoric acid. The project site is located in an existing industrial area near the to the city Samsun, Turkey.
For more information on the environmental, social and human rights aspects of the project, please refer to the Non-Technical Summary Environmental Impact Assessment (PDF, 0.8 MB).
The project involves the construction and operation of a petrochemical complex for the production of 5.844 million tons of aromatic petrochemicals and petroleum products annually. The project site is located in Pengerang Industrial Park in Kota Tinggi district, Johor, Malaysia.
For more information on the environmental, social and human rights aspects of the project, please refer to the Environmental Social and Health Impact Assessment (ESHIA) (PDF, 15 MB).
The project involves the construction and operation of a wind farm with 12 wind turbines and a generation capacity of 65 MW. The project site is located approximately 110 km north of Adana.
For more information on the environmental, social and human rights aspects of the project, please refer to the Environmental Impact Assessment (EIA, PDF, 11 MB).
The project involves the construction and operation of a wind farm with 44 wind turbines and a generation capacity of 211 MW. The project site is located approximately 75 km northwest of Istanbul.
For more information on the environmental, social and human rights aspects of the project, please refer to the Environmental and Social Due Diligence Report (PDF, 10 MB).
The project involves the construction and operation of a new combined-cycle gas turbine power plant with a total generation capacity of approximately 420 MW. The project site is located north of the city of Mymensingh.
More detailed information on the environmental, social and human rights aspects can be found in the Environmental Impact Assessment (EIA, PDF 8.81 MB).
The project consists in the construction and operation of a new heavy fuel oil power plant with a generating capacity of about 150 MW. The project site is located northeast of the town of Sreepur in the Gazipur District.
More detailed information on the environmental, social and human rights aspects of the project can be found in the Environmental Impact Assessment Report, which we can provide on request (e-Mail to: Umwelt@agaportal.de).
The project consists in the construction and operation of a plant for the production of propylene oxide using the so-called hydroperoxide-to-propylene oxide (HPPO) process. The project site is located near the city of Zibo in Shandong Province.
If required, additional information on the environmental, social and human rights aspects of the project can be found in the Environmental Impact Assessment Report (EIA, PDF, 1 MB).
The project consists in the construction and operation of a new pulp and paper mill in the established Tieshangang Coastal Industrial Area (TCIA) 45 km east of Beihai City.
More detailed information on environmental, social and human rights aspects of the project can be found in the Environmental Impact Assessment (EIA, PDF, 54.3 MB).
The project consists of the construction and operation of a wind farm with 21 wind turbines and a generation capacity of 88 MW. The project is located about 40 km northwest of Dȏng Hà.
Further information on the project’s environmental, social and human rights aspects can be found in the Environmental and Social Impact Assessment (ESIA, PDF, 19 MB).
The project consists of the construction and operation of a wind farm with 12 wind turbines and a generation capacity of 40.8 MW. The project is located about 50 km northwest of Dȏng Hà.
Further information on the project’s environmental, social and human rights aspects can be found in the Environmental and Social Impact Assessment (ESIA, PDF, 19 MB).
Supported projects 2021/2022
If the contract value of a project exceeds EUR 15 million, basic project data are published after a final commitment for cover has been made provided that the exporter has given its consent. This information is brought up to date at the beginning of each month however with a time-lag of three months.
The order values are divided into the following categories:
- Category 1: up to Euro 15 million
- Category 2: up to Euro 50 million
- Category 3: up to Euro 100 million
- Category 4: up to Euro 200 million
- Category 5: above Euro 200 million
Projects supported in previous years can be found in the project archive (German version).
List of officially supported projects (as at 6.1.2023)
Exporter: ACENDIS Healthcare GmbH, Hannover Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: Hospital equipment Category: 2 Buyer's country: Türkiye Credit period: 10 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: GIM Export Group GmbH & Co. KG, Göttingen Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: Plant for the production of coated chipboard as well as a biomass energy plant Category: 4 Buyer's country: Spain Credit period: 8.5 years Project category according to Common Approaches: B International standards: World Bank Safeguard Operational Policies Enviromental, social and human rights issues: Air emissions, timber supply chain Monitoring: no Exporter: Dieffenbacher GmbH, Eppingen Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: Production line for chipboard including peripheral equipment Category: 2 Buyer's country: India Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank Safeguard Operational Policies (OP) Enviromental, social and human rights issues: Air and noise emissions, timber supply chain, labour rights Monitoring: no Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: Aluminium cold rolling mill Category: 2 Buyer's country: India Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./.
Exporter: Uhde Inventa-Fischer GmbH, Berlin Financial institution: ./. Project: Plant for the production of polyester granulate Category: 2 Buyer's country: Türkiye Credit period: near cash terms Project category according to Common Approaches: K International standards: ./. Enviromental, social and human rights issues: Air emissions, waste water Monitoring: no Exporter: Achenbach Buschhütten GmbH & Co. KG, Kreuztal Financial institution: ./. Project: Rolling line for battery foil Category: 2 Buyer's country: China, PR Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./.
Exporter: Commit Project Partners GmbH, Berlin Financial institution: Berliner Sparkasse, Berlin Project: Textile machines Category: 2 Buyer's country: Uzbekistan Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank Safeguard Operational Policies (OP) Enviromental, social and human rights issues: Waste water, working conditions Monitoring: no Exporter: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf Financial institution: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt Project: Hybrid production plant for the production of polypropylene film (BOPP) and polyethylene film (BOPE) Category: 2 Buyer's country: Indonesia Credit period: 10 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Trützschler Group SE, Mönchengladbach Financial institution: Commerzbank AG, Frankfurt Project: Delivery, installation and commissioning of a textile plant Category: 2 Buyer's country: Uzbekistan Credit period: 8 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: a German exporter Financial institution: HSBC Trinkaus & Burkhardt GmbH, Düsseldorf Project: 12 wind turbines with a total capacity of 65 MW for the installation of a wind farm Category: 2 Buyer's country: Türkiye Credit period: 14.5 years Project category according to Common Approaches: A International standards: World Bank Enviromental, social and human rights issues: Biodiversity, occupational health and safety, resettlements Monitoring: no Exporter: a German exporter Financial institution: Landesbank Hessen-Thüringen Girozentrale, Frankfurt Project: Production plant for BOPET film Category: 2 Buyer's country: China, PR Credit period: 10 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: a German exporter Financial institution: Bayerische Landesbank, München Project: Supply of 4 multi-purpose helicopters Category: 2 Buyer's country: Mexico Credit period: 10 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Textima Export Import GmbH, Berlin Financial institution: ING Bank, a branch of ING-DiBa AG, Frankfurt Project: Various textile machines Category: 2 Buyer's country: Bangladesh Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank Enviromental, social and human rights issues: Occupational health and safety and labour standards, health and safety of the population Monitoring: no
Exporter: Gauff GmbH & Co. KG Engineering KG, Nürnberg in a consortium with Queiroz Galvao Konstruktion GmbH, Nürnberg Financial institution: Consortium with Standard Chartered Bank, London and
DZ Bank AG Deutsche Zentral-Genossenschaftsbank, FrankfurtProject: Rehabilitation of a road Category: 3 Buyer's country: Angola Credit period: 10 years Project category according to Common Approaches: B International standards: IFC Performance Standards Enviromental, social and human rights issues: Occupational health and safety, noise, raw materials Monitoring: no Exporter: GIM Export Group GmbH & Co. KG, Göttingen Financial institution: Commerzbank AG, Frankfurt Project: Supply of a plant for the production of coated particle board Category: 4 Buyer's country: Luxembourg/ Liechtenstein Credit period: 8.5 years Project category according to Common Approaches: E International standards: ./. Enviromental, social and human rights issues: Timber supply chain, occupational health and safety Monitoring: no Exporter: Dürr Systems AG, Bietigheim-Bissingen Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: Final assembly plant for electric cars Category: 2 Buyer's country: Türkiye Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank Safeguard Operational Policies (OP) Enviromental, social and human rights issues: Air emissions, traffic Monitoring: no Exporter: two German exporters Financial institution: Landesbank Hessen-Thüringen, Frankfurt Project: Supply and installation of 12 rotor spinning machines and 35 spinning preparation machines Category: 2 Buyer's country: Türkiye Credit period: 7 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Trützschler Group SE, Mönchengladbach Financial institution: Commerzbank AG, Frankfurt Project: Supply and installation of a textile plant Category: 2 Buyer's country: Uzbekistan Credit period: 7 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: 2 basic oxygen furnaces Category: 2 Buyer's country: India Credit period: near cash terms Project category according to Common Approaches: K International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: J.M. Voith SE & Co. KG, Heidenheim Financial institution: ./. Project: 2 paper machines Category: 2 Buyer's country: China, PR Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: a German exporter Financial institution: JPMorgan Chase Bank, NA, London Branch, v.d. J.P. Morgan SE, Frankfurt Project: Supply and installation supervision of a biomass power plant and of a dryer for a particle board plant (MDP plant) Category: 2 Buyer's country: Brazil Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank Enviromental, social and human rights issues: Timber supply chain, emissions Monitoring: no Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: Roll stand for a hot rolling mill Category: 2 Buyer's country: India Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./.
Exporter: Gauff GmbH & Co. Engineering KG, Nuremberg in a consortium with Noráfrica GmbH, Wartenberg Financial institution: Standard Chartered Bank, London (Konsortialführer) with DZ BANK AG, Frankfurt and ODDO BHF AG, Frankfurt Project: Factory for veterinary vaccines Category: 4 Buyer's country: Angola Credit period: 10 years Project category according to Common Approaches: B International standards: IFC Performance Standards Enviromental, social and human rights issues: Annimal welfare, waste water, air emissions Monitoring: no Exporter: a German exporter Financial institution: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt Project: Preparatory machinery and equipment for a spinning mill Category: 2 Buyer's country: Türkiye Credit period: 8 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Textima Export Import GmbH, Berlin Financial institution: Commerzbank Aktiengesellschaft, Frankfurt Project: Supply, installation and commissioning of equipment for the finishing of woven fabrics Category: 2 Buyer's country: Uzbekistan Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank Enviromental, social and human rights issues: Waste water, waste, occupational health and safety Monitoring: no Exporter: Trützschler Groupe SE, Mönchengladbach Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: Textile plant Category: 2 Buyer's country: Uzbekistan Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank Enviromental, social and human rights issues: Waste, occupational health and safety, working conditions Monitoring: no Exporter: Jebsen & Jessen Industrial Solutions GmbH, Hamburg Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: Machiney for the production of packages Category: 2 Buyer's country: Umm al-Quwain, UAE Credit period: 10 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./.
Exporter: a German exporter Financial institution: Sumitomo Mitsui Banking Corporation, Singapore Branche, v.d. Sumitomo Mitsui Banking Corporation, Düsseldorf Project: Construction of a 420 MW combined cycle power plant Category: 2 Buyer's country: Bangladesh Credit period: 12 years Project category according to Common Approaches: A International standards: IFC Performance Standards (PS) / World Bank Enviromental, social and human rights issues: Air emissions, occupational health and safety, resettlements, health and safety of the population Monitoring: yes Exporter: a German exporter Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: Supply of a crawler crane LR 13000 Category: 2 Buyer's country: United States Credit period: 8 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Uhde Inventa-Fischer GmbH, Berlin Financial institution: ./. Project: Plant for the production of polyester chips and polyester melt Category: 4 Buyer's country: Türkiye Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./.
Exporter: J.M: Voith SE & Co. KG, Heidenheim Financial institution: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt Project: Equipment for the modification of a paper machine Category: 2 Buyer's country: Indonesia Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank Enviromental, social and human rights issues: Waste water, air emissions, ambient air and economic displacement Monitoring: yes Exporter: a German exporter Financial institution: Groups of banks led by Credit Suisse AG, Zürich Project: 500 lorries Category: 2 Buyer's country: Lithuania/Poland Credit period: 5 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: a German exporter Financial institution: Commerzbank Aktiengesellschaft, Frankfurt Project: Supply of axles, components and prefabricated parts for the production of trailers / semi-trailers for lorries Category: 2 Buyer's country: Türkiye Credit period: 5 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Jebsen & Jessen Industrial Solutions GmbH, Hamburg Financial institution: Standard Chartered Bank, Frankfurt Project: Supply and installation of cranes, heavy load transporters, reach stackers, a generator and accessories for use in infrastructure projects including training Category: 2 Buyer's country: Dubai, UAE Credit period: 10 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./.
Exporter: a German exporter Financial institution: Groups of banks led by Credit Suisse AG, Zürich Project: Supply of box trucks and curtain sider trucks Category: 2 Buyer's country: Lithuania/Poland Credit period: 5 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Lindauer DORNIER Gesellschaft mit beschränkter Haftung, Lindau Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: plant for the production of polyethylene terephthalate (BOPET) foils Category: 2 Buyer's country: India Credit period: 8 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: a German exporter Financial institution: Commerzbank Aktiengesellschaft, Frankfurt Project: nonwovens plant for the production of spun-bonded fabric Category: 2 Buyer's country: United States Credit period: 8.5 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: Brückner Maschinenbau GmbH & Co. KG, v.d. Brückner Group GmbH, Siegsdorf Financial institution: Commerzbank Aktiengesellschaft, Frankfurt Project: supply, installation supervision and commissioning of a plant for the production of BOPP foils
incl. peripheral and downstream equipmentCategory: 2 Buyer's country: Türkiye Credit period: 8 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Elbe-Flugzeugwerke GmbH, Dresden Financial institution: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt Project: conversion of an Airbus A330-300 Category: 2 Buyer's country: Türkiye Credit period: 5 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Textima Export Import GmbH, Berlin Financial institution: Coöperatieve Rabobank U.A., Utrecht Project: bottling plant Category: 2 Buyer's country: Ghana Credit period: 7 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: Two German exporters Financial institution: Bayerische Landesbank, Munich Project: equipment for the production of corrugated card board as well as
materials handling equipmentCategory: 2 Buyer's country: Türkiye Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: noise emissions, occupational health and safety Monitoring: no
Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: Aluminium rolling mill Category: 2 Buyer's country: China, PR Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Three German exporters Financial institution: Consortium HSBC Trinkaus & Burkhardt AG, Düsseldorf with
AKA Ausfuhrkreditgesellschaft mbH, Frankfurt, Commerzbank Aktiengesellschaft, FrankfurtProject: equipment for a sugar refinery Category: 4 Buyer's country: Egypt Credit period: 10 years Project category according to Common Approaches: A International standards: IFC Performance Standards (PS) Enviromental, social and human rights issues: impacts on aquifiers, labour standards, occupational health and safety, potential child labour
in the supply chainMonitoring: yes
Exporter: J.M. Voith SE & Co. KG, Heidenheim Financial institution: ./. Project: paper machine Category: 2 Buyer's country: China, PR Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: a German exporter Financial institution: The Hongkong and Shanghai Banking Corporation Limited, Hongkong Project: sugar house Category: 3 Buyer's country: Bangladesh Credit period: 10 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: Oerlikon Textile GmbH & Co. KG, Remscheid Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: textile machinenes Category: 3 Buyer's country: India Credit period: 10 years Project category according to Common Approaches: E International standards: ./. Enviromental, social and human rights issues: fire safety Monitoring: no Exporter: a German exporter Financial institution: Bayerische Landesbank, Munich Project: installation of wind turbines at various sites Category: 2 Buyer's country: Türkiye Credit period: 10.5 years Project category according to Common Approaches: B International standards: World Bank Safeguard Oerational Policies (OP) Enviromental, social and human rights issues: impacts on flora and fauna, expropriations Monitoring: no Exporter: GIM Export Group GmbH & Co. KG, Göttingen Financial institution: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt Project: modernisation of two board factories at different sites Category: 2 Buyer's country: Türkiye Credit period: 8 years Project category according to Common Approaches: E International standards: ./. Enviromental, social and human rights issues: wood supply chain Monitoring: no Exporter: two German exporters Financial institution: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt Project: four plants for the production of biaxially oriented polyethylene terephthalate film (BOPET) and
three cutting machines Category: 3 Buyer's country: China, PR Credit period: 10 years Project category according to Common Approaches: B International standards: IFC Performance Standards (PS) Enviromental, social and human rights issues: local raw material production, air emissions, labour rights Monitoring: no Exporter: a German exporter Financial institution: KfW IPEX-Bank GmbH, Frankfurt Project: wind turbines Category: 4 Buyer's country: Canada Credit period: 18 years Project category according to Common Approaches: B International standards: IFC Performance Standards (PS) Enviromental, social and human rights issues: health and safety of the population, impacts on birds and bats Monitoring: yes
Exporter: a German exporter Financial institution: KfW IPEX-Bank GmbH, Frankfurt Project: wind turbines Category: 2 Buyer's country: Canada Credit period: 18 years Project category according to Common Approaches: B International standards: IFC Performance Standards (PS) Enviromental, social and human rights issues: health and safety of the population, impacts on birds and bats Monitoring: yes Exporter: a German exporter Financial institution: KfW IPEX-Bank GmbH, Frankfurt Project: wind turbines Category: 3 Buyer's country: Canada Credit period: 18 years Project category according to Common Approaches: B International standards: IFC Performance Standards (PS) Enviromental, social and human rights issues: health and safety of the population, impacts on birds and bats Monitoring: yes
Exporter: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf Financial institution: Oldenburgische Landesbank Aktiengesellschaft, Oldenburg Project: plant for the production of polyethylene terephthalate films (BOPET) Category: 2 Buyer's country: India Credit period: 8.5 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: a German exporter Financial institution: groups of banks led by Credit Suisse AG, Zürich (leading bank) Project: supply of box vehicles and curtainsider trucks Category: 3 Buyer's country: Lithuania/Poland Credit period: 5 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: a German exporter Financial institution: groups of banks led by Credit Suisse AG, Zürich (leading bank) Project: supply of 800 lorries Category: 2 Buyer's country: Lithuania/Poland Credit period: 5 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: installation of a ring rolling plant Category: 2 Buyer's country: China, PR Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./.
Exporter: Oerlikon Textile GmbH & Co. KG, Remscheid Financial institution: Bayerische Landesbank, Munich Project: spinning machines and winders for the production of yarns Category: 2 Buyer's country: Türkiye Credit period: 10 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: a German exporter Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: construction of three wind farms Category: 3 Buyer's country: Vietnam Credit period: 11.5 years Project category according to Common Approaches: A International standards: IFC Performance Standards (PS) Enviromental, social and human rights issues: noise, flicker, biodiversity, economic resettlement, indigenous people Monitoring: yes Exporter: Dürr Systems AG, Bietigheim-Bissingen Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: supply, installation and commissioning of a painting plant Category: 3 Buyer's country: Türkiye Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank Safeguard Operational Policies (OP) Enviromental, social and human rights issues: air emissions, traffic Monitoring: no Exporter: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf / another Exporter Financial institution: Oldenburgische Landesbank AG, Oldenburg Project: plant for the production of polyethylene terephthalate (BOPET) film / slicing machines Category: 2 Buyer's country: India Credit period: 8.5 yeras Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: Jebsen & Jessen Industrial Solutions GmbH, Hamburg Financial institution: ODDO BHF AG, Frankfurt Project: supply and installation of components for two solar power stations Category: 2 Buyer's country: Sierra Leone Credit period: 9 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Windmöller & Hölscher KG, Lengerich Financial institution: ./. Project: paper sack lines Category: 2 Buyer's country: China, PR Credit period: 5 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Oerlikon Textile GmbH & Co. KG, Remscheid and another Exporter Financial institution: Bayerische Landesbank, Munich Project: plants for the production of yarns Category: 2 Buyer's country: Türkiye Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank Safeguard Operational Policies (OP) Enviromental, social and human rights issues: Waste water, occupational health and safety, hazardous substances Monitoring: no Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: Engineering and supply of equipment for the modernisation of three converters in a converter steel mill incl. training and supervison Category: 2 Buyer's country: Russia Credit period: Near cash terms Project category according to Common Approaches: K International standards: ./. Enviromental, social and human rights issues: Plant safety and occupational health and saftety Monitoring: no
Exporter: MAVEG Industrieausrüstungen GmbH, Ratingen Financial institution: AKA Ausfuhrkredit-Gesellschaft mbH, Frankfurt Project: Supply, installation and commissioning of machines for the production of information and automation technology, primarily machines for metal and wood machining as well as for process control and for logistics Category: 2 Buyer's country: Azerbaijan Credit period: 10 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: a German exporter Financial institution: Standard Chartered Bank Project: Supply of gas and steam turbines as well as generators Category: 4 Buyer's country: Pakistan Credit period: 12 years Project category according to Common Approaches: A International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: Air emissions, waste water, labour rights Monitoring: yes Exporter: Siemens AG Financial institution: Commerzbank AG, Frankfurt Project: Modernisation of 40 gas turbines including services Category: 3 Buyer's country: Iraq Credit period: 5 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: a German exporter Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: Construction of two wind farms Category: 2 Buyer's country: Vietnam Credit period: 13 years Project category according to Common Approaches: A International standards: IFC Performance Standards (PS) Enviromental, social and human rights issues: Noise, flicker, biodiversity, economic resettlement, indigenous population groups Monitoring: yes Exporter: Textima Export Import GmbH Financial institution: Berliner Sparkasse, Niederlassung der Landesbank Berlin AG, Berlin Project: Supply, installation and commissioning of production plants for acrylic yarn and knitwear Category: 2 Buyer's country: Uzbekistan Credit period: 10 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: Siemens Energy Global GmbH & Co. KG, Erlangen Financial institution: The Hongkong and Shanghai Banking Corporation Limited, Hongkong Project: Turn-key construction of a 603 MV gas and steam turbine power plant Category: 5 Buyer's country: Hong Kong (China, PR) Credit period: 12 yeras Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: Ambient air quality, air emissions, waste water, labour standards Monitoring: no Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: LD converter including gas prurification as well as degassing and desulphurisation plant Category: 2 Buyer's country: India Credit period: Near cash terms Project category according to Common Approaches: K International standards: ./. Enviromental, social and human rights issues: Resettlement, waste water Monitoring: no Exporter: INZAG Germany GmbH, Wiesbaden Financial institution: Standard Chartered Bank (Hong Kong) Limited, Hong Kong Project: Road construction Category: 5 Buyer's country: Ghana Credit period: 10 years Project category according to Common Approaches: A International standards: IFC Perfomance Standards (PS) Enviromental, social and human rights issues: Expropriation and resettlement Monitoring: yes Exporter: GIM Export Group GmbH & Co. KG, Göttingen Financial institution: Raiffeisen Bank International AG, Vienna Project: Machinery and plant for the production of oriented strand board Category: 4 Buyer's country: Ukraine/Cyprus Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank Safeguard Operational Policies (OP) Enviromental, social and human rights issues: Raw material sourcing, air emissions Monitoring: no Exporter: Aerodata AG, Braunschweig Financial institution: Commerzbank AG, Frankfurt Project: Supply of two aircaft, equipped for maritime surveillance, search & rescue as well as fisheries patrol Category: 2 Buyer's country: Cote d'Ivoire Credit period: 10 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./.
Exporter: J.M. Voith SE & Co. KG, Heidenheim Financial institution: Natixis S.A., Paris Project: modification of a paper machine Category: 4 Buyer's country: France/Norway Credit period: 8.5 years Project category according to Common Approaches: E International standards: ./. Enviromental, social and human rights issues: occupational health and safety Monitoring: no Exporter: German exporters Financial institution: KfW IPEX-Bank GmbH, Frankfurt Project: supply of large components in connection with the building of a new cruise ship Category: 4 Buyer's country: United Kingdom Credit period: 12 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: German exporters Financial institution: KfW IPEX-Bank GmbH, Frankfurt Project: supply of large components in connection with the building of a new cruise ship Category: 4 Buyer's country: United Kingdom Credit period: 12 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./.
Exporter: a German exporter Financial institution: Bayerische Landesbank, Munich Project: wind turbines Category: 2 Buyer's country: Türkiye Credit period: 12 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: bio diversity, health of the local residents Monitoring: no Exporter: a German exporter Financial institution: Landesbank Hessen-Thüringen Girozentrale, Frankfurt Project: gear cutting and measuring machines Category: 2 Buyer's country: China, PR Credit period: 8.5 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: resettlements Monitoring: no Exporter: Trützschler GmbH & Co. KG, Mönchengladbach Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: textile plant Category: 2 Buyer's country: Uzbekistan Credit period: 10 yeras Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: raw material supply chain, occupational health and safety and working conditions Monitoring: no Exporter: GIM Export Group GmbH & Co. KG, Göttingen Financial institution: Landesbank Hessen-Thüringen Girozentrale, Frankfurt Project: plant for the production of HDF/MDF boards Category: 3 Buyer's country: Türkiye Credit period: 10 yeras Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: wood supply chain, air emissions Monitoring: no Exporter: MAN Energy Solutions SE, Augsburg Financial institution: ./. Project: air compressor trains Category: 2 Buyer's country: China, PR Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: tandem pickling line Category: 3 Buyer's country: Türkiye Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Oerlikon Textile GmbH & Co. KG, c/o Oerlikon Barmag, Remscheid Financial institution: Standard Chartered Bank (Singapore) Limited, Singapore Project: supply and installation of a polyester fibre plant including polycondensation plant,
a staple fibre line as well as spinning, winding and texturing machinesCategory: 2 Buyer's country: Bangladesh Credit period: 7 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: air emissions, noise, waste water, occupational health and safety Monitoring: no
Exporter: Jebsen & Jebsen Industrial Solutions GmbH, Hamburg Financial institution: a German bank Project: supplies and services for a 150 MW HFO-diesel power station Category: 3 Buyer's country: Bangladesh Credit period: 12 years Project category according to Common Approaches: A International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: air emissions, noise, occupational health and safety, health and safety of the population,
resettlementsMonitoring: yes Exporter: VAMED Engineering Deutschland GmbH, Bad Homburg Financial institution: ODDO BHF Aktiengesellschaft, Frankfurt Project: a hospital Category: 4 Buyer's country: Angola Credit period: 10 years Project category according to Common Approaches: B International standards: IFC Performance Standards (PS) Enviromental, social and human rights issues: waste, sewage Monitoring: no Exporter: CONVEX International GmbH, Köln Financial institution: Raiffeisen Bank International AG, Wien Project: 2 silo facilities Category: 2 Buyer's country: Ukraine Credit period: 5 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: a German exporter Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: Construction of a wind farm Category: 2 Buyer's country: Vietnam Credit period: 12 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: economic resettlements, impact on the avifauna, occupational health and safety,
labour rights, health and safety of the populationMonitoring: yes Exporter: Lindauer DORNIER GmbH, Lindau and three other Exporters Financial institution: Oldenburgische Landesbank AG, Oldenburg Project: supply of a BOPET film production plant including installation supervision and commissioning Category: 2 Buyer's country: India Credit period: 8.5 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: Lindauer DORNIER GmbH, Lindau Financial institution: Landesbank Baden-Württemberg, Leipzig Project: plant for the production of polyethylene terephthalate film (BOPET) Category: 2 Buyer's country: India Credit period: 10 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: modernisation of a hot strip mill Category: 2 Buyer's country: Russia Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Trützschler GmbH & Co. KG, Mönchengladbach Financial institution: AKA Ausfuhrkredit-Gesellschaft mit beschränkter Haftung, Frankfurt Project: textile plant including buiding Category: 3 Buyer's country: Uzbekistan Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: supply chain, working conditions Monitoring: no
Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: hot strip mill Category: 3 Buyer's country: India Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: MEYER WERFT GmbH & Co. KG, Papenburg Financial institution: ./. Project: delivery of a cuise ship Category: 5 Buyer's country: Japan Credit period: 25 years (not covered) Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Brückner Machinenbau GmbH & Co. KG, v.d. Brückner Group GmbH, Siegsdorf Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: plant for the production of biaxially oriented polypropylene oil (BOPP) foil including
peripheral and downstream equipmentCategory: 2 Buyer's country: Indonesia Credit period: 10 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: J.M. Voith SE & Co. KG, Heidenheim Financial institution: ./. Project: paper machine Category: 2 Buyer's country: China, PR Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf Financial institution: DZ BANK Deutsche Zentral-Genossenschaftsbank, Frankfurt Project: two plants for the production of biaxially oriented polypropylene (BOPP) foil Category: 2 Buyer's country: China, PR Credit period: 10 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: a German exporter Financial institution: Banco Santander S.A., Madrid Project: intralogistic solutions for a distribution centre Category: 2 Buyer's country: Poland Credit period: 5 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: a German exporter Financial institution: Consortium of banks, under the aegis of:
Credit Suisse AG, Zürich, (Consortium leader) (approx. 21,0%)
Bayerische Landesbank, Munich (approx. 15,0%)
Citibank N.A., London Branch, London (approx. 14,5%)
DZ Bank AG, Frankfurt (approx. 16,5%)
ING Bank, a branch of ING-DiBa AG, Frankfurt (approx. 12,5%)
Landesbank Baden-Württemberg, Stuttgart (approx. 20,5%)Project: supply of trailers with tarpaulin covers and refrigerator trailers Category: 3 Buyer's country: Lithuania Credit period: 5 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Commit Project Partners GmbH, Berlin Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: supply and installation of equipment for a furniture plant Category: 3 Buyer's country: Lithuania Credit period: 8.5 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: supply chain, occupational health and safety Monitoring: no Exporter: Carl Friederichs GmbH, Frankfurt Financial institution: Deutsche Bank AG, Frankfurt Project: 112 ambulances Category: 2 Buyer's country: Ghana Credit period: 7 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./.
Exporter: SMS group, Düsseldorf Financial institution: ./. Project: Supply of a section and rail rolling mill Category: 4 Buyer's country: Dubai, UAE Credit period: near cash terms Project category according to Common Approaches: K International standards: ./. Enviromental, social and human rights issues: sensitive areas, workers rights Monitoring: no Exporter: J.M. Voith SE & Co. KG, Heidenheim Financial institution: ./. Project: paper machine Category: 2 Buyer's country: China, PR Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: a German exporter Financial institution: KfW IPEX-Bank GmbH, Frankfurt Project: a luxury expedition cruise ship Category: 5 Buyer's country: United Kingdom Credit period: 12 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: J.M. Voith SE & Co. KG, Heidenheim Financial institution: ./. Project: paper machine Category: 3 Buyer's country: China, PR Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: SMS group GmbH Financial institution: ./. Project: components for a Steckel rolling mill Category: 2 Buyer's country: China, PR Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: SMS group GmbH Financial institution: ./. Project: hot strip mill Category: 3 Buyer's country: India Credit period: near cash terms Project category according to Common Approaches: K International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: a German exporter Financial institution: consortium of German banks Project: supply of the equipment for a 100 MW diesel power station Category: 2 Buyer's country: Bangladesh Credit period: 9 years Project category according to Common Approaches: B International standards: general guidelines, EHS guidelines for thermal power Enviromental, social and human rights issues: air emissions, noise, occupational health and safety, health and safety of the general public Monitoring: no Exporter: two German exporters Financial institution: Natixis S.A., Paris, as Hermes-Agent in a banking consortium Project: construction and operation of a telecommunications satellite Category: 4 Buyer's country: Malaysia Credit period: 12 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./.
Exporter: a German exporter Financial institution: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt Project: plant for the production of biaxially oriented polypropylene films (BOPP) Category: 2 Buyer's country: China, PR Credit period: 10 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: a German exporter Financial institution: Landesbank Hessen-Thüringen, Frankfurt Project: Three plants (lines N, Q und R) for the production of biaxially oriented polyethylene
terephthalat films (BOPET) as well as a recycling systemCategory: 3 Buyer's country: China, PR Credit period: 8.5 years Project category according to Common Approaches: E International standards: ./. Enviromental, social and human rights issues: occupational health ans safety Monitoring: no Exporter: J.M. Voith SE & Co. KG, Heidenheim Financial institution: ./. Project: delivery, installation and commissioning of a production plant for packaging paper Category: 4 Buyer's country: Türkiye Credit period: near cash terms Project category according to Common Approaches: K International standards: ./. Enviromental, social and human rights issues: waste water Monitoring: no Exporter: Commit Project Partners GmbH, Berlin Financial institution: Raiffeisen Bank International AG, Vienna Project: equipment and machinery for a furniture factory Category: 2 Buyer's country: Lithuania Credit period: 8.5 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: supply chain, occupational health and safety Monitoring: no Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: engineering, supply of equipment and machinery, technical documentation, installation supervision and
commissioning for the modernisation of an existing pickling line / tandem cold rolling millCategory: 2 Buyer's country: Brazil Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: engineering, supply of equipment and machinery, technical documentation,
installation supervision and commissioning for a continuous annealing und galvanisation lineCategory: 3 Buyer's country: Brazil Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./.
Exporter: Bellmer GmbH, Niefern-Öschelbronn Financial institution: ./. Project: supplies and services in connection with the conversion of a paper rmachine Category: 2 Buyer's country: Austria Credit period: near cash terms Project category according to Common Approaches: E International standards: ./. Enviromental, social and human rights issues: resource efficiency and prevention of pollution Monitoring: no Exporter: Nordex Energy SE & Co. KG, Hamburg Financial institution: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt Project: construction of a wind farm Category: 2 Buyer's country: Türkiye Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: biodiversity, labour standards, expropriations Monitoring: no Exporter: a German exporter Financial institution: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt Project: supply of spinning and spooling machines for the production of
pre-oriented yarns (POY)Category: 2 Buyer's country: China, PR Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: workers' rights and occupational safety Monitoring: no Exporter: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf Financial institution: ODDO BHF AG, Frankfurt Project: supply of a plant for the production of biaxially oriented polypropylene (BOPP) foil including services Category: 2 Buyer's country: Nigeria Credit period: 5 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: Intec Engineering GmbH, Bruchsal Financial institution: ODDO BHF AG, Frankfurt Project: biomass power plant Category: 2 Buyer's country: Türkiye Credit period: 7 years Project category according to Common Approaches: B International standards: World Bank Safeguard Operational Policies (OP) Enviromental, social and human rights issues: waste recycling Monitoring: no Exporter: GE Wind Energy GmbH, Salzbergen Financial institution: Commerzbank AG, Frankfurt Project: supply, installation and commissioning of 14 wind turbines for a wind farm Category: 2 Buyer's country: Türkiye Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: impact on bird and bat species, occupational safety, expropriations Monitoring: yes Exporter: GE Wind Energy GmbH, Salzbergen Financial institution: Commerzbank AG, Frankfurt Project: supply, installation and commissioning of 14 wind turbines for a wind farm Category: 2 Buyer's country: Türkiye Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: impact on bird and bat species, impact on the population, occupational safety, expropriations Monitoring: yes Exporter: Reifenhäuser Reicofil GmbH und Co. KG, Troisdorf Financial institution: HSBC Trinkhaus & Burkhardt AG, Düsseldorf Project: plant for the production of filter fleece and a production line for spun-bonded fabric Category: 2 Buyer's country: Brazil Credit period: 10 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: GIM Export Group GmbH, Co. KG, Göttingen Financial institution: Landesbank Hessen-Thüringen Girozentrale, Frankfurt Project: modernisation of existing chipboard and MDF board plants Category: 2 Buyer's country: Türkiye Credit period: 10 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: a German exporter Financial institution: AKA Ausfuhrkredit-Gesellschaft mit beschränkter Haftung, Frankfurt Project: production plant for BOPET foil Category: 2 Buyer's country: India Credit period: 10 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: Nordex Energy SE & Co. KG, Hamburg Financial institution: Norddeutsche Landesbank, Hannover Project: construction of a wind farm Category: 4 Buyer's country: Finland Credit period: 15 years Project category according to Common Approaches: B International standards: IFC Performance Standards (PS) Enviromental, social and human rights issues: none Monitoring: no
Exporter: Engineering Dobersek GmbH, Mönchengladbach Financial institution: ./. Project: plant for the production of nickel cathodes Category: 2 Buyer's country: Russia Credit period: 7 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Richard Kablitz GmbH, Lauda-Königshofen Financial institution: a German bank Project: supply, installation and commissioning of a biomass power plant Category: 2 Buyer's country: Belarus Credit period: 7 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: raw materials supply Monitoring: no Exporter: Engineering DOBERSEK GmbH, Mönchengladbach Financial institution: ./. Project: Supplies and services for a crushing and classification plant Category: 2 Buyer's country: Russia Credit period: near cash terms Project category according to Common Approaches: K International standards: ./. Enviromental, social and human rights issues: biodiversity, health and safety of the population Monitoring: no Exporter: Ferrostaal Equipment Solutions GmbH, Hamburg Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: machinery for the manufacture of packaging Category: 2 Buyer's country: UAE Umm al Qaiwain Credit period: 10 yeras Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: no Exporter: Textima Export Import GmbH, Berlin Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: machines for the production of nonwovens Category: 3 Buyer's country: Türkiye Credit period: 10 years Project category according to Common Approaches: C International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: No Exporter: SMS group GmbH, Düsseldorf Financial institution: consortium of banks, under the aegis of UniCredit Bank AG, Munich and
DZ Bank AG Deutsche Zentral-Genossenschaftsbank, Frankfurt am MainProject: delivery, installation and commissioning of a medium section mill (rolling mill) Category: 3 Buyer's country: Italy Credit period: 8.5 years Project category according to Common Approaches: E International standards: ./. Enviromental, social and human rights issues: CO2 emissions Monitoring: no Exporter: GIM Export Group GmbH & Co. KG, Göttingen Financial institution: Raiffeisen Bank International AG, Wien Project: supply of a plant for the production of chip boards Category: 3 Buyer's country: Ukraine Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: sourcing of raw materials, air emissions Monitoring: no Exporter: a German exporter Financial institution: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt Project: extruders with pelleting system Category: 2 Buyer's country: China, PR Credit period: 10 years Project category according to Common Approaches: B International standards: IFC Performance Standards (PS) Enviromental, social and human rights issues: air emissions, waste water, handling of hazardous materials, occupational health and safety Monitoring: no Exporter: a German exporter Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: textil machines for synthetic yarns Category: 2 Buyer's country: China, PR Credit period: 10 years Project category according to Common Approaches: E International standards: ./. Enviromental, social and human rights issues: occupational health and safety, air and noise emissions, waste management Monitoring: no Exporter: a German exporter Financial institution: AKA Ausfuhrkredit-Gesellschaft mbH, Frankfurt Project: supply of 6 large diesel engines as well as electro-mechanical equipment Category: 2 Buyer's country: Bangladesh Credit period: 12 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: air emissions, noise, occupational health and safety, health and safety of the population Monitoring: no Exporter: a German exporter Financial institution: Landesbank Baden-Württemberg, Leipzig Project: plant for the manufacture of packaging papers Category: 2 Buyer's country: China, PR Credit period: 10 years Project category according to Common Approaches: A International standards: IFC Performance Standards (PS) Enviromental, social and human rights issues: air and noise emissions, energy and water consumption, waste water, safety
of the populatiion, resettlements and expropriation as well as soucing of raw materialsMonitoring: yes Exporter: Ferrostaal Equipment Solutions GmbH, Hamburg Financial institution: Landesbank Baden-Württemberg, Leipzig Project: supply of spinning machines including services Category: 2 Buyer's country: Bangladesh Credit period: 10 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Siemens AG, Erlangen Financial institution: Deutsche Bank AG, Frankfurt Project: turnkey construction of a combined gas and steam power plant Category: 4 Buyer's country: Russia Credit period: 12 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: air emissions Monitoring: no
Exporter: a German exporter Financial institution: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt am Main Project: installation of a wind farm Category: 2 Buyer's country: Türkiye Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank Safeguard Operational Policies (OP) Enviromental, social and human rights issues: flora and fauna Monitoring: yes Exporter: Ferrostaal Equipment Solutions GmbH, Hamburg Financial institution: Landesbank Hessen-Thüringen Girozentrale, Frankfurt Project: supply and installation of cranes and transport machinery Category: 2 Buyer's country: Dubai, UAE Credit period: 10 years Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: Brückner Maschinenbau GmbH & Co. KG, v.d. Brückner Group GmbH, Siegsdorf Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: BOPET film plant Category: 2 Buyer's country: India Credit period: 10 years Project category according to Common Approaches: E International standards: ./. Enviromental, social and human rights issues: air emissions, waste, waste water Monitoring: no Exporter: SMS group GmbH, Düsseldorf Financial institution: ./. Project: expansion of a hot strip plant Category: 2 Buyer's country: Türkiye Credit period: near cash terms Project category according to Common Approaches: ./. International standards: ./. Enviromental, social and human rights issues: ./. Monitoring: ./. Exporter: J.M. Voith SE & Co. KG, Heidenheim Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: paper machine Category: 2 Buyer's country: China, PR Credit period: near cash terms Project category according to Common Approaches: K International standards: ./. Enviromental, social and human rights issues: wood supply chain and waste water Monitoring: no
Exporter: thyssenkrupp Industrial Solutions AG, Essen Financial institution: a German bank Project: Extension of a coal terminal Category: 3 Buyer's country: Russia Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: Dust emissions, offshore dredging, occupational health and safety Monitoring: no
Exporter: Nordex Energy SE & Co. KG, Hamburg Financial institution: Commerzbank AG, Frankfurt Project: Delivery, installation and commissioning of 9 wind turbines with a capacity '
of 4.0-4.5 MW each for the establishment of the wind farm "Atakale"Category: 2 Buyer's country: Türkiye Credit period: 14 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: Impacts on flora and fauna Monitoring: no Exporter: Trützschler GmbH & Co. KG, Mönchengladbach Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: textile plant Category: 2 Buyer's country: Uzbekistan Credit period: 10 years Project category according to Common Approaches: B International standards: World Bank safeguard operational policies (OP) Enviromental, social and human rights issues: occupational health and safety and work standards, community health and safety Monitoring: no Exporter: Oerlikon Textile GmbH & Co. KG, Remscheid Financial institution: Landesbank Baden-Württemberg, Stuttgart Project: Spinning and spooling machines Category: 2 Buyer's country: India Credit period: 10 yeras Project category according to Common Approaches: E International Standards: ./. Enviromental, social and human rights issues: fire protection Monitoring: no
Exporteur: ACENDIS Healthcare GmbH, Hannover Finanzierende Bank: Landesbank Baden-Württemberg, Stuttgart Warenart/Projekt: Krankenhausausstattung Kategorie: 2 Bestellerland: Türkei Kreditlaufzeit: 10 Jahre Projektkategorie gemäß Common Approaches: ./. Angelegte intern. Standards: ./. Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: ./. Monitoring: ./. Exporteur: GIM Export Group GmbH & Co. KG, Göttingen Finanzierende Bank: Landesbank Baden-Württemberg, Stuttgart Warenart/Projekt: Produktionsanlage zur Herstellung beschichteter Spanplatten sowie einer Biomasse-Energieanlage Kategorie: 4 Bestellerland: Spanien Kreditlaufzeit: 8,5 Jahre Projektkategorie gemäß Common Approaches: B Angelegte intern. Standards: Weltbank Safeguard Operational Policies Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: Luftemissionen, Holzlieferkette Monitoring: Nein Exporteur: Dieffenbacher GmbH, Eppingen Finanzierende Bank: Landesbank Baden-Württemberg, Stuttgart Warenart/Projekt: Produktionslinie für Spanplatten mit Peripherieequipment Kategorie: 2 Bestellerland: Indien Kreditlaufzeit: 10 Jahre Projektkategorie gemäß Common Approaches: B Angelegte intern. Standards: Weltbank Safeguard Operational Policies (OP) Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: Luft- und Lärmemissionen, Holzlieferkette, Arbeiterrechte Monitoring: Nein Exporteur: SMS group GmbH, Düsseldorf Finanzierende Bank: ./. Warenart/Projekt: Aluminium-Kaltwalzwerk Kategorie: 2 Bestellerland: Indien Kreditlaufzeit: liefer-/leistungsnah Projektkategorie gemäß Common Approaches: ./. Angelegte intern. Standards: ./. Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: ./. Monitoring: ./.
Exporteur: Uhde Inventa-Fischer GmbH, Berlin Finanzierende Bank: ./. Warenart/Projekt: Produktionsanlage zur Herstellung von Polyestergranulat Kategorie: 2 Bestellerland: Türkei Kreditlaufzeit: liefer-/leistungsnah Projektkategorie gemäß Common Approaches: K Angelegte intern. Standards: ./. Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: Luftemissionen, Abwasser Monitoring: Nein Exporteur: Achenbach Buschhütten GmbH & Co. KG, Kreuztal Finanzierende Bank: ./. Warenart/Projekt: Walzlinie für Batteriefolie Kategorie: 2 Bestellerland: China, VR Kreditlaufzeit: liefer-/leistungsnah Projektkategorie gemäß Common Approaches: ./. Angelegte intern. Standards: ./. Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: ./. Monitoring: ./.
Exporteur: Commit Project Partners GmbH, Berlin Finanzierende Bank: Berliner Sparkasse, Berlin Warenart/Projekt: Textilmaschinen Kategorie: 2 Bestellerland: Usbekistan Kreditlaufzeit: 10 Jahre Projektkategorie gemäß Common Approaches: B Angelegte intern. Standards: Weltbank Safeguard Operational Policies (OP) Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: Abwasser, Arbeitsbedingungen Monitoring: Nein Exporteur: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf Finanzierende Bank: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt Warenart/Projekt: Hybride Produktionsanlage zur Produktion von Polypropylen-Folien (BOPP) und Polyethylen-Folien (BOPE) Kategorie: 2 Bestellerland: Indonesien Kreditlauftzeit: 10 Jahre Projektkategorie gemäß Common Approaches: C Angelegte intern. Standards: ./. Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: ./. Monitoring: ./. Exporteur: Trützschler Group SE, Mönchengladbach Finanzierende Bank: Commerzbank AG, Frankfurt Warenart/Projekt: Lieferung, Montage und Inbetriebnahme einer Textilanlage Kategorie: 2 Bestellerland: Usbekistan Kreditlauftzeit: 8 Jahre Projektkategorie gemäß Common Approaches: ./. Angelegte intern. Standards: ./. Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: ./. Monitoring: ./. Exporteure: Ein deutscher Exporteure Finanzierende Bank: HSBC Trinkaus & Burkhardt GmbH, Düsseldorf Warenart/Projekt: 12 Windenergieanlagen mit einer Kapazität von insgesamt 65 MW zur Errichtung eines Windparks Kategorie: 2 Bestellerland: Türkei Kreditlauftzeit: 14,5 Jahre Projektkategorie gemäß Common Approaches: A Angelegte intern. Standards: Weltbank Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: Biodiversität, Arbeitssicherheit, Umsiedlungen Monitoring: Nein Exporteur: Ein deutscher Exporteur Finanzierende Bank: Landesbank Hessen-Thüringen Girozentrale, Frankfurt Warenart/Projekt: Produktionsanlage für BOPET-Folien Kategorie: 2 Bestellerland: China, VR Kreditlauftzeit: 10 Jahre Projektkategorie gemäß Common Approaches: C Angelegte intern. Standards: ./. Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: ./. Monitoring: Nein Exporteur: Ein deutscher Exporteur Finanzierende Bank: Bayerische Landesbank, München Warenart/Projekt: Lieferung von 4 Mehrzweckhubschraubern Kategorie: 2 Bestellerland: Mexiko Kreditlauftzeit: 10 Jahre Projektkategorie gemäß Common Approaches: ./. Angelegte intern. Standards: ./. Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: ./. Monitoring: ./. Exporteur: Textima Export Import GmbH, Berlin Finanzierende Bank: ING Bank, eine Niederlassung der ING-DiBa AG, Frankfurt Warenart/Projekt: Diverse Textilmaschinen Kategorie: 2 Bestellerland: Bangladesch Kreditlaufzeit: 10 Jahre Projektkategorie gemäß Common Approaches: B Angelegte intern. Standards: Weltbank Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: Arbeitssicherheit und Arbeitsstandards, Gesundheit und Sicherheit der Bevölkerung Monitoring: Nein
Exporteur: Gauff GmbH & Co. Engineering KG, Nürnberg in einem Konsortium mit Noráfrica GmbH, Wartenberg Finanzierende Bank: Standard Chartered Bank, London (Konsortialführer) mit DZ BANK AG, Frankfurt und ODDO BHF AG, Frankfurt Warenart/Projekt: Tierimpfstofffabrik Kategorie: 4 Bestellerland: Angola Kreditlaufzeit: 10 Jahre Projektkategorie gemäß Common Approaches: B Angelegte intern. Standards: IFC Performance Standards Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: Tierwohl, Abwasser, Luftemissionen Monitoring: Nein Exporteur: Ein deutscher Exporteur Finanzierende Bank: DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt Warenart/Projekt: Spinnereivorbereitungsmaschinen und -anlagen Kategorie: 2 Bestellerland: Türkei Kreditlaufzeit: 8 Jahre Projektkategorie gemäß Common Approaches: ./. Angelegte intern. Standards: ./. Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: ./. Monitoring: ./. Exporteur: Textima Export Import GmbH, Berlin Finanzierende Bank: Commerzbank Aktiengesellschaft, Frankfurt Warenart/Projekt: Lieferung, Montage und Inbetriebnahme von Ausrüstungen für die Veredelung von Webwaren Kategorie: 2 Bestellerland: Usbekistan Kreditlaufzeit: 10 Jahre Projektkategorie gemäß Common Approaches: B Angelegte intern. Standards: Weltbank Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: Abwasser, Abfälle, Arbeitssicherheit Monitoring: Nein Exporteur: Trützschler Groupe SE, Mönchengladbach Finanzierende Bank: Landesbank Baden-Württemberg, Stuttgart Warenart/Projekt: Textilanlage Kategorie: 2 Bestellerland: Usbekistan Kreditlaufzeit: 10 Jahre Projektkategorie gemäß Common Approaches: B Angelegte intern. Standards: Weltbank Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: Abfälle, Arbeitssicherheit, Arbeitsbedingungen Monitoring: Nein Exporteur: Jebsen & Jessen Industrial Solutions GmbH, Hamburg Finanzierende Bank: Landesbank Baden-Württemberg, Stuttgart Warenart/Projekt: Maschinen zur Herstellung von Verpackungen Kategorie: 2 Bestellerland: Umm al Kaiwain, VAE Kreditlaufzeit: 10 Jahre Projektkategorie gemäß Common Approaches: ./. Angelegte intern. Standards: ./. Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: ./. Monitoring: ./.
Exporteur: Ein deutscher Exporteur Finanzierende Bank: Sumitomo Mitsui Banking Corporation, Singapore Branche, v.d. Sumitomo Mitsui Banking Corporation, Düsseldorf Warenart/Projekt: Errichtung eines 420 MW GuD-Kraftwerkes (Combined Cycle Power Plant) Kategorie: 2 Bestellerland: Bangladesch Kreditlaufzeit: 12 Jahre Projektkategorie gemäß Common Approaches: A Angelegte intern. Standards: IFC Performance Standards (PS) / Weltbank Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: Luftemissionen, Arbeitssicherheit, Umsiedlungen, Gesundheit und Sicherheit der Bevölkerung Monitoring: Ja Exporteur: Ein deutscher Exporteur Finanzierende Bank: Landesbank Baden-Württemberg, Stuttgart Warenart/Projekt: Lieferung eines Raupenkrans LR 13000 Kategorie: 2 Bestellerland: Vereinigte Staaten Kreditlaufzeit: 8 Jahre Projektkategorie gemäß Common Approaches: ./. Angelegte intern. Standards: ./. Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: ./. Monitoring: ./. Exporteur: Uhde Inventa-Fischer GmbH, Berlin Finanzierende Bank: ./. Warenart/Projekt: Produktionsanlagen zur Herstellung von Polyestergranulat bzw. von Polyesterschmelze Kategorie: 4 Bestellerland: Türkei Kreditlaufzeit: liefer-/leistungsnah Projektkategorie gemäß Common Approaches: ./. Angelegte intern. Standards: ./. Wesentliche Umwelt-, Sozial- und
Menschenrechtsaspekte: ./. Monitoring: ./.