Project Information

Category A projects before final commitment 2020

Category A projects, i.e. projects which may have serious environmental, social or human rights impacts, are published no later than 30 days before a final decision on the granting of export credit cover is taken. Subsequent firm commitments for cover are not recorded in this list.

Information on Category A projects covered in previous years can be found in the project archive (German version).

The project consists in the expansion of a plant for the production of cardboard and packaging paper. The expansion will result in an increase of the production capacity by about 61% from 450,000 to 725,000 tons annually. The project is located in the town of Obbola, some 15 km southeast of Umeå. 
More detailed information on the environmental, social and human rights aspects of the project can be found in the summary of the Environmental Impact Assessment (PDF, 1.93 MB).

The project consists in the construction and operation of a combine cycle power plant with a capacity of 900 MW. The project includes decommissioning of two heavy fuel oil/gas power plant units. The project is located in Port Quasim, Karachi.
More detailed information on the project’s environmental, social and human rights aspects can be found in the Environmental and Social Impact Assessment (ESIA, PDF, 11 MB). 

The project consists in the expansion of a wind farm on the Karaburun peninsula some 50 km west of Izmir, which was put into service at the end of 2013, by 37 additional wind turbines.More detailed information on the project’s environmental, social and human rights aspects can be found in the Non-Technical-Summary (PDF, 1,35 MB).

Reporting to the OECD

The publication of Category A and B projects for which cover has been granted is part of the rules laid down by the OECD Common Approaches. Category A and B projects as defined in the Common Approaches which are supported with export credit guarantees are reported to the OECD. Here, you will find an overview of the OECD for all member countries.

 

In 2018 12 projects classified as Category A having an order value of 8.5 billion euros and 34 projects classified as Category B having an order value of 9.9 billion euros were supported with an export credit guarantee. Details can be found in the Annual Report 2018.

Supported projects 2019/2020

If the contract value of a project exceeds EUR 15 million, basic project data are published after a final commitment for cover has been made provided that the exporter has given its consent. This information is brought up to date at the beginning of each month however with a time-lag of three months.

The order values are divided into the following categories:

  • Category 1: up to Euro 15 million
  • Category 2: up to Euro 50 million
  • Category 3: up to Euro 100 million
  • Category 4: up to Euro 200 million
  • Category 5: above Euro 200 million

 

Projects supported in previous years can be found in the project archive (German version).

 

List of officially supported projects (as at 31.01.2020)

Exporter:a German exporter
Financial institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:15 years
Project category according to Common Approaches:  B
International Standards:Weltbank
Enviromental, social and human rights issues:Impacts on the avifauna
Monitoring:No

Exporter:a German exporter
Financial institution:DZ BANK AG, Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:2 film stretching lines for the production of biaxial oriented polyester (BOPET) film
Category:2
Buyer's country:China, PR
Credit period:10 yeras
Project category according to Common Approaches:  C
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:No
  
Exporter:SMS group GmbH, Düsseldorf
Financial institution:./.
Project:Supplies and servies for a CNC radial-axial ring rolling machine
Category:2
Buyer's country:China, PR
Credit period:Near cash terms
Project category according to
Common Approaches:
 ./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.
  
Exporter:MEYER WERFT GmbH & Co. KG, Papenburg
Financial institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Construction and delivery of a cruise ship
Category:5
Buyer's country:Bahamas / United States
Credit period:12 years
Project category according to
Common Approaches:
./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.
  
Exporter:MEYER WERFT GmbH & Co. KG, Papenburg
Financial institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Construction and delivery of a cruise ship
Category:5
Buyer's country:Bahamas / United States
Credit period:12 years
Project category according to
Common Approaches:
./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.
  
Exporter:a German exporter
Financial institution:Oldenburgische Landesbank AG, Bremen
Project:Supply of two all-purpose rolling lines for the production of aluminium foil, a rolling oil rectification plant, a separator and a roll grinding machine
Category:2
Buyer's country:India
Credit period:8.5 years
Project category according to
Common Approaches:
./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.
  
Exporter:a German exporter
Financial institution:ING Bank, eine Niederlassung der ING-DiBa AG, Frankfurt
Project:Supply of 11,529 coated titanium anodes including suspension device and 
accessories for the modernisation of an existing plant
Category:2
Buyer's country:Russia
Credit period:10 years
Project category according to
Common Approaches:
E
International Standards:./.
Enviromental Social and Human Rights Issues:Air emissions, waste water, occupational health and safety
Monitoring:No
  
Exporter:KRONES Aktiengesellschaft, Neutraublo
Financial institution:Landesbank Baden-Württemberg, Leipzig
Project:Brewery
Category:3
Buyer's country:Brazil
Credit period:10 years
Project category according to
Common Approaches:
C
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:No
  
Exporter:Nordex Energy GmbH, Hamburg
Financial institution:KfW, Frankfurt
Project:Expansion of an existing and construction of a new wind farm
Category:2
Buyer's country:Argentina
Credit period:4 years
Project category according to
Common Approaches:
B
International Standards:IFC Performance Standards
Enviromental Social and Human Rights Issues:Impacts on flora und fauna, occupational health and safety
Monitoring:No

Exporter:MAN Truck & Bus SE, München
Financial institution:./.
Project:300 road tractors as complete knocked-down kits as well as two towing and recovery vehilcles
Category:2
Buyer's country:Nigeria
Credit period:5 years
Project category according to Common Approaches:  ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
  
Exporter:a German exporter
Financial institution:diverse Banken unter Konsortialführung der KfW IPEX-Bank GmbH, Frankfurt
Project:Construction and delivery of a cruise ship
Category:5
Buyer's country:United Kingdom
Credit period:12 years
Project category according to Common Approaches:./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
  
Exporter:a German exporter
Financial institution:diverse Banken unter Konsortialführung der KfW IPEX-Bank GmbH, Frankfurt
Project:Construction and delivery of a cruise ship
Category:5
Buyer's country:United Kingdom
Credit period:12 years
Project category according to Common Approaches:./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
  
Exporter:MAN Energy Solutions SE, Augsburg
Financial institution:AKA Ausfuhrkredit-Gesellschaft mbH, Frankfurt
Project:Supply of 3 large diesel engines as well as electromechanical equipment for a diesel power station
Category:2
Buyer's country:Bangladesh
Credit period:1 year resp. 12 years credit
Project category according to Common Approaches:B
International Standards:Weltbank
Enviromental, social and human rights issues:Air emissions, occupational health and safety
Monitoring:No
  
Exporter:SMS Group GmbH, Düsseldorf
Financial institution:./.
Project:Gas recovery systems
Category:2
Buyer's country:Russia
Credit period:near cash terms
Project category according to Common Approaches:./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
  
Exporter:Horn Glass Industries AG, Plößberg
Financial institution:KfW IPEX-Bank GmbH, Frankfurt, konsortial mit Commerzbank AG, Frankfurt
Project:Flat glass plant
Category:3
Buyer's country:Uzbekistan
Credit period:8 years
Project category according to Common Approaches:B
International Standards:Weltbank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Air emissions, ambient air quality, energy consumption, occupational health and safety
Monitoring:Yes
  
Exporter:Textima Export Import GmbH, Berlin
Financial institution:AKA Ausfuhrkredit-Gesellschaft mit beschränkter Haftung, Frankfurt
Project:Machinery and equipment for the production of cooling units
Category:2
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches:E
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:No
  
Exporter:thyssenkrupp Industrial Solutions AG, Dortmund
Financial institution:./.
Project:Plant for the production of propylene oxide
Category:3
Buyer's country:China, PR
Credit period:near cash terms
Project category according to Common Approaches:./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

Exporter:SIRONA Dental Systems GmbH, Bensheim
Financial institution:./.
Project:Supply of 245 treatment units (dentists' chairs) including dental instruments as well as hygiene systems, X-ray equipment and accessories
Category:2
Buyer's country:Algeria
Credit period:Near cash terms
Project category according to Common Approaches:  ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
  
Exporter:Siempelkamp Maschinen- und Anlagenbau GmbH, Krefeld sowie weitere Exporteure
Financial institution:Banco Santander S.A., Madrid
Project:Plant for the production of medium-density fibreboard
Category:2
Buyer's Country:Brazil
Credit period:8 years
Project category according to
Common Approaches:
 ./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.
  
Exporter:NEPTUNG WERFT GmbH & Co. KG, Rostock
Financial institution:Konsortium: 
KfW IPEX-Bank GmbH, Frankfurt 
UBS Switzerland AG, Zürich 
Bayerische Landesbank, München
Project:Construction and delivery of two river cruise ships
Category:3
Buyer's Country:Switzerland / Bermuda
Credit period:8.5 years
Project category according to
Common Approaches:
./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.

Exporteur:Ferrostaal Equipment Solutions GmbH, Hamburg
Finanzierende Bank:Konsortium KfW IPEX-Bank GmbH, Frankfurt und
Commerzbank AG, Frankfurt
Warenart/Projekt:Gebäudekomplex "Azuri Towers"
Kategorie:2
Bestellerland:Nigeria
Kreditlaufzeit:8 Jahre
Projektkategorie gemäß
Common Approaches:
 B
Angelegte intern. Standards:Weltbank Standards
Wesentliche Umwelt-, Sozial-
und Menschenrechsaspekte:
Arbeitssicherheit
Monitoring:Nein
  
Exporteur:Nordex Energy GmbH, Hamburg
Finanzierende Bank:Commerzbank AG, Frankfurt
Warenart/Projekt:Errichtung eines Windparks
Kategorie:2
Bestellerland:Türkei
Kreditlaufzeit:10 Jahre
Projektkategorie gemäß
Common Approaches:
 B
Angelegte intern. Standards:Weltbank
Wesentliche Umwelt-, Sozial-
und Menschenrechsaspekte:
Gesundheit und Sicherheit der Bevölkerung, Auswirkungen auf Flora und Fauna, Arbeitssicherheit
Monitoring:Nein

Exporter: J. M. Voith SE & Co. KG, Heidenheim
Financial institution:./.
Project:Plant for the production of packaging papers
Category:2
Buyer's country:China, PR
Credit period:near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

 
Exporter: Various
Financial institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Spinning machines and winders
Category:5
Buyer's country:China, PR
Credit period:10 years
Project category according to Common Approaches: B
International Standards:IFC Performance Standards
Enviromental, social and human rights issues:Occupational and plant safety
Monitoring:Yes

 
Exporter: Lindauer DORNIER Gesellschaft mit beschränkter Haftung, Lindau Kampf Schneid- und Wickeltechnik GmbH & Co. KG, Wiehl
Financial institution:Oldenburgische Landesbank
Project:A BOPET foil plant
Category:2
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches:B
International Standards:World Bank
Enviromental, social and human rights issues:Economic resettlements
Monitoring:No

 
Exporter: a German exporter
Financial institution:Bayerische Landesbank, München
Project:Construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:11 years
Project category according to Common Approaches: E
International Standards:./.
Enviromental, social and human rights issues:Occupational safety
Monitoring:No

 
Exporter: Siemens Mobility GmbH, Erlangen
Financial institution:./.
Project:Supply, commissioning and registration of 13 high-speed trains
Category:5
Buyer's country:Russia
Credit period:near cash terms
Project category according to Common Approaches: C
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

 

Exporter: Nordex Energy GmbH, Hamburg
Financial institution:KfW, Frankfurt
Project:Wind farm
Category:4
Buyer's country:Argentina
Credit period:15 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:                                    ./.                
Monitoring:           ./.              

 
Exporter: GIM Export Group GmbH & Co. KG, Göttingen
Financial institution:ING Bank, eine Niederlassung der ING-DiBa AG, Frankfurt
Project:Machinery and plant for the production of plywood
Category:2
Buyer's country:Belarus
Credit period:10 years
Project category according to Common Approaches:E
International Standards:./.
Enviromental, social and human rights issues:Wood supply chain, labour rights                
Monitoring:No
 
Exporter: Vollert Anlagenbau GmbH, Weinsberg
Financial institution:Commerzbank AG, Frankfurt
Project:Supply, installation monitoring and commissioning of a plant for the production of precast concrete parts
Category:2
Buyer's country:Uzbekistan
Credit period:7 years
Project category according to Common Approaches: C
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:No

 
Exporter: Trützschler GmbH & Co. KG, Mönchengladbach
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Supply, installation and commissioning of spinning preparatory and spinning machines, an air
 conditioning and filter plant, laboratory 
equipment, cans, as well as pre-loom and weaving machines and other accessoriess
Category:2
Buyer's country:Uzbekistan
Credit period:10 years
Project category according to Common Approaches: B
International Standards:World Bank Operational Safeguard Policies
Enviromental, social and human rights issues:Potential child and forced labour
Monitoring:No

 
Exporter: Nordex Energy GmbH, Hamburg
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Supply, installation and commissioning of 10 wind turbines for the construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches: A
International Standards:World Bank
Enviromental, social and human rights issues:Sensitive area, expropriations
Monitoring:No
 

Exporter: Various
Financial institution:SMBC
Project:Offshore wind farm
Category:5
Buyer's country:Taiwan
Credit period:15.5 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:                         ./.                            
Monitoring:           ./.              

 
Exporter: SMS group GmbH, Düsseldorf
Financial institution:./.
Project:Modification of 3 BOF converters
Category:2
Buyer's country:Taiwan
Credit period:near cash terms
Project category according to Common Approaches:./.
International Standards:./.
Enviromental, social and human rights issues:               ./.                
Monitoring:./.
 
Exporter: SMS group GmbH, Düsseldorf
Financial institution:./.
Project:              Section mill                      
Category:2
Buyer's country:China, PR
Credit period:near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

 
Exporter: SMS group GmbH, Düsseldorf
Financial institution:./.
Project:Supplies and services for a hot strip mill
Category:2
Buyer's country:China, PR
Credit period:near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

 
Exporter: a German exporter
Financial institution:AKA Ausfuhrkredit-Gesellschaft mbH, Frankfurt
Project:Supply and supervision of the commissioning of eight diesel engines and associated mechanical and electronic equipment for a 100 MW power plant
Category:2
Buyer's country:Bangladesh
Credit period:10.5 years
Project category according to Common Approaches: B
International Standards:World Bank
Enviromental, social and human rights issues:Air emissions, noise, occupational safety, health and safety of the public
Monitoring:No

 
Exporter: Reifenhäuser REICOFIL GmbH & Co. KG, Troisdorf
Financial institution:Standard Chartered Bank, London
Project:Supply and installation of a Reicofil plant for the production of spanbonded nonwovens
Category:2
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter: a German exporter
Financial institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Gas and steam tubine generator sets
Category:4
Buyer's country:Bahrain
Credit period:14 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

 
Exporter: ANDRITZ HYDRO GmbH, Ravensburg
Financial institution:./.
Project:Supply, installation and commissioning of electromechanical equipment for two  
small hydropower plants
Category:2
Buyer's country:Egypt
Credit period:near cash terms
Project category according to Common Approaches: K
International Standards:./.
Enviromental, social and human rights issues:Resettlements, biodiversity, waste, water and air pollution during the construction phase
Monitoring:No
 

Exporter: a German exporter
Financial institution:Natixis S.A., Paris (Konsortialführer)
Project:Gas pipeline
Category:5
Buyer's country:Switzerland
Credit period:14 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

 
Exporter: KATT GmbH, Celle
Financial institution:./.
Project:Special purpose vehicles for oil field services incl. spare parts
Category:2
Buyer's country:Russia
Credit period:near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

 
Exporter: Saurer Spinning Solutions GmbH & Co. KG, Übach-Palenberg
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Supply, installation and commisioning of spinning preparatory machinery,  
spinning machines, air conditioning and filter systems, a yary laboratory and steaming equipment
Category:2
Buyer's country:Uzbekistan
Credit period:10 years
Project category according to Common Approaches: B
International Standards:Weltbank
Enviromental, social and human rights issues:                   Potential child and forced labour
Monitoring:No

 
Exporter: a German exporter
Financial institution:Landesbank Hessen-Thüringen, Frankfurt
Project:Construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:9.5 years
Project category according to Common Approaches: B
International Standards:Weltbank
Enviromental, social and human rights issues:         Potential impacts on birds and bats
Monitoring:Yes

 
Exporter: a German exporter
Financial institution:Landesbank Hessen-Thüringen, Frankfurt
Project:Construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches:B
International Standards:Weltbank
Enviromental, social and human rights issues:Impacts of flora and fauna, occupational health and safety
Monitoring:No

 
Exporter: MAN Energy Solutions SE, Augsburg
Financial institution:./.
Project:Supply of a steam turbine
Category:2
Buyer's country:Egypt
Credit period:near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 

Exporter: a German exporter
Financial institution:Commerzbank AG, Frankfurt
Project:Textile machines
Category:2
Buyer's country:Turkey
Credit period:10 years
Project category according to Common Approaches: C
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:No
 
Exporter: Textima Export Import GmbH, Berlin
Financial institution:AKA Ausfuhrkredit-Gesellschaft mit beschränkter Haftung, Frankfurt
Project:Machinery and equipment for the production of foils as well as the construction of a new factory building
Category:2
Buyer's country:Abu Dhabi, UAE
Credit period:10 years
Project category according to Common Approaches: C
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:No
 
Exporter: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf
Financial institution:Bayerische Landesbank, München
Project:Plant for the production of polyethylene terephthalate foils (BOPET)
Category:2
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches: C
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:No
 
Exporter: Ferrostaal Equipment Solutions GmbH, Hamburg
Financial institution:ODDO BHF AG, Frankfurt
Project:Supply of machinery for the production and packaging of pharmaceutical 
products
Category:2
Buyer's country:Bangladesh
Credit period:5 years
Project category according to Common Approaches: E
International Standards:./.
Enviromental, social and human rights issues:Effluents, air emissions, labour standards
Monitoring:No
 
Exporter: a German exporter
Financial institution:Australia and New Zealand Banking Group Ltd., Melbourne,
v.d. ANZ, Frankfurt
Project:6 water bottling plants
Category:2
Buyer's country:China, PR
Credit period:4 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

 

Exporter: GE Wind Energy GmbH, Salzbergen
Financial institution:Bayerische Landesbank, München
Project:Construction of a wind farm (100 MW)
Category:3
Buyer's country:Ukraine
Credit period:9.5 years
Project category according to Common Approaches: B
International Standards:IFC Performance Standards
Enviromental, social and human rights issues:Impacts on flora and fauna, occupational health and safety and community health, safety and security, environmental noise
Monitoring:No
 
Exporter: a German exporter
Financial institution:Crédit Agricole Corporate and Investment Bank, Singapore Branch
Project:Building and delivery of 2 roll-on/roll-off ferries
Category:3
Buyer's country:Singapore
Credit period:12 years
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.
 
Exporter: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf
Financial institution:Commerzbank AG, Frankfurt
Project:Supply, installation and commissioning of a plant for the production of polypropylene foil
Category:2
Buyer's country:Uzbekistan
Credit period:10 years
Project category according to Common Approaches: C
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:No
 

Exporter: a German exporter
Financial institution:Bayerische Landesbank, München
Project:Supply and installation of 14 wind turbines for the construction of a wind farm
Category:2
Buyer's country:Turkey
Credit period:15 years
Project category according to Common Approaches: A
International Standards:World Bank
Enviromental, social and human rights issues:Possible impacts on a sensitive area
Monitoring:Yes
 
Exporter: Siemens AG, Erlangen 
Financial institution:Konsortium Deutsche Bank AG with
Bayerische Landesbank
DZ Bank AG Deutsche Zentral-Genossenschaftsbank
Landesbank Baden-Württemberg
UniCredit Bank AG
AKA Ausfuhrkredit-Gesellschaft mit beschränkter Haftung
Project:Construction of a combined cycle power plant
Category:5
Buyer's country:Russia
Credit period:12 years
Project category according to Common Approaches: E
International Standards: 
Enviromental, social and human rights issues:Economic displacements in connection with the new, additional network connection
Monitoring:No
 
Exporter: Trützschler GmbH & Co. KG, Mönchengladbach
Financial institution:Commerzbank AG, Frankfurt
Project:Spinning machines
Category:2
Buyer's country:Uzbekistan
Credit period:7 years
Project category according to Common Approaches: B
International Standards:World Bank
Enviromental, social and human rights issues:Potential child and forced labour
Monitoring:No
 
Exporter: Veridos GmbH, Berlin
Financial institution:./.
Project:Production plant for identity cards
Category:3
Buyer's country:Bangladesh
Credit period:near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

 
Exporter: Voith Hydro GmbH & Co. KG, Heidenheim
Financial institution:./.
Project:Rehabilitation of the existing hydro-electric power station Nangbéto.
Category:2
Buyer's country:Togo
Credit period:near cash terms
Project category according to Common Approaches: ./.
International Standards:./.
Enviromental, social and human rights issues:./.
Monitoring:./.

Exporter:Siempelkamp Maschinen- und Anlagenbau GmbH, Krefeld 
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:Chipboard plant
Category:2
Buyer's Country:Lithuania
Credit period:10 years
Project category according to
Common Approaches:
 
./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.
 
Exporter:Uniper - Technologies GmbH, Gelsenkirchen
Financial institution:Bayerische Landesbank, München
Project:Expansion and modernisation of steam power plant
Category:2
Buyer's Country:Azerbaijan
 Credit period:8 years
Project category according to
Common Approaches:
 
 B
International Standards:Weltbank
Enviromental Social and Human Rights Issues: Air emissions 
Monitoring:No
 
Exporter:   Gauff GmbH & Co. Engineering KG, Nürnberg in einem deutschen Joint Venture mit QUEIROZ GALVÃO KONSTRUKTION GmbH, Nürnberg
Financial institution:Commerzbank AG, Frankfurt (konsortial)mit AKA Ausfuhrkredit-Gesellschaft mit beschränkterHaftung, Frankfurt und Landesbank Hessen-Thüringen, Frankfurt
Project:Rehabilitation of the road section Cariango - Mussende (about 34 km)      
Category:2
Buyer's Country:Angola
Credit period:10 years
Project category according to
Common Approaches:
 
./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.
  
Exporter:Gauff GmbH & Co. Engineering KG, Nürnberg, als kaufmännischer Federführer in einem deutschen Joint Venture mit INZAG Germany GmbH, Berlin
Financial institution:Commerzbank AG, Frankfurt (konsortial)mit AKA Ausfuhrkredit-Gesellschaft mit beschränkterHaftung, Frankfurt und Landesbank Hessen-Thüringen, Frankfurt
Project:Rehabilitation of the road section Cutato - Cuchi (about 60 km)
Category:3
Buyer's Country:Angola
Credit period:10 years
Project category according to
Common Approaches:
 
./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.
 
Exporter:a german exporter 
Financial institution:Banco Bilbao Vizcaya Argentaria S.A., Frankfurt
Project:Maintenance and repair of engines
Category:2
Buyer's Country:Mexico
Credit period:5 years
Project category according to
Common Approaches:
 
./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.
 
Exporter:Senvion GmbH                          
Financial institution:KfW
Project:Wind farm
Category:3
Buyer's Country:Argentina
Credit period:15 years
Project category according to
Common Approaches:
 
./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.
 
Exporter:Ferrostaal Equipment Solutions GmbH, Hamburg
Financial institution:ODDO BHF AG, Frankfurt
Project:Machinery for the manufacturing of generics
Category:2
Buyer's Country:Saudi Arabia
Credit period:8 years
Project category according to
Common Approaches:
 
B
International Standards:Weltbank
Enviromental Social and Human Rights Issues:Waste water, hazardous substances, occupational safety
Monitoring:No
 
Exporter:SMS group GmbH, Düsseldorf
Financial institution:./.
Project:Supply of a rolling unit including services
Category:2
Buyer's Country:China, PR
Credit period:Near cash terms
Project category according to
Common Approaches:
 
./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.
 
Exporter:MAN Energy Solutions SE, Augsburg
Financial institution:./.
Project:2 air compressor trains
Category:2
Buyer's Country:China, PR
Credit period:Near cash terms
Projektkategorie according to
Common Approaches:
 
./.
International Standards:./.
Enviromental Social and Human Rights Issues:./.
Monitoring:./.